If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0164111506032 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 03/06-15-016-11W4/2 | |
| Location Alias: 03/06-15-16-11 W4M | |
| Location Alias 2: 03/06-15-016-11 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 016 | |
| Meridian: 4 | |
| Range: 11 | |
| Section: 15 | |
| County/Municipality: County of Newell | |
| Well Name: TXNE ALDSON 6-15-16-11 | |
| Operator Name: Torxen Energy Ltd. | |
| License Number: 0295525 | |
| License Date: 2003-11-04 | |
| License Status: Amended | |
| Spud Date: 2003-12-06 | |
| Final Drill Date: 2003-12-09 | |
| Well Total Depth: 1156.00 m | |
| Surface Hole Latitude: 50.349910 | |
| Surface Hole Longitude: -111.441701 |
| Date | Event |
|---|---|
| 2003-11-04 | Obtained License |
| 2003-12-06 | Surface Casing Operation Performed |
| 2003-12-07 | Direction Drilling Operation Performed - Deviate |
| 2003-12-09 | Finished Drilling |
| 2003-12-09 | Well Log Performed |
| 2003-12-09 | Well Mode changed to Drilled and Cased |
| 2003-12-10 | Production Casing Operation Performed |
| 2003-12-10 | Rig Released |
| 2004-02-26 | Perforation Treatment Performed - Jet Perforation |
| 2004-02-26 | Well Log Performed |
| 2004-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2004-03-02 | Plug Back Performed |
| 2004-03-02 | Well Log Performed |
| 2004-06-24 | Well Log Performed |
| 2004-06-26 | Perforation Treatment Performed - Jet Perforation |
| 2004-06-27 | Perforation Treatment Performed - Fractured |
| 2004-07-07 | Well Began Production |
| 2004-07-07 | Well Fluid changed to Gas |
| 2004-07-07 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2003-12-07 | 255.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-02-26 | Perforation | 997.00 | 998.00 | 17 |
| 2004-03-02 | Packing Device Capped w/Cement | 977.00 | 985.00 | 0 |
| 2004-06-26 | Perforation | 656.00 | 658.00 | 7 |
| 2004-06-27 | Fracture | 656.00 | 658.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 3672 | 0.0 | 0.0 | 0.0 |
| 2005 | 8746 | 0.0 | 0.0 | 0.0 |
| 2006 | 8759 | 0.0 | 0.0 | 0.0 |
| 2007 | 8759 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8759 | 0.0 | 0.0 | 0.0 |
| 2011 | 8759 | 0.0 | 0.0 | 0.0 |
| 2012 | 8783 | 0.0 | 0.0 | 0.0 |
| 2013 | 8735 | 0.0 | 0.0 | 0.0 |
| 2014 | 8687 | 0.0 | 0.0 | 0.0 |
| 2015 | 8711 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8735 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8735 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]