X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0164030506002

Well Details

Well ID: 0164030506002
Loading map...
Location: 00/06-05-016-03W4/2
Location Alias: 00/06-05-16-03 W4M
Location Alias 2: 00/06-05-016-03 W4/02
Country: Canada
Province: Alberta
Township: 016
Meridian: 4
Range: 03
Section: 05
County/Municipality: Cypress County
Well Name: GASCAN MEDHAT 6-5-16-3
Operator Name: TAQA North Ltd.
License Number: 0071921
License Date: 1978-09-14
License Status: Issued
Spud Date: 1978-10-15
Final Drill Date: 1978-10-17
Well Total Depth: 811.00 m
Surface Hole Latitude: 50.315762
Surface Hole Longitude: -110.383435

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-09-14 Obtained License
1978-10-17 Finished Drilling
1978-10-17 Well Mode changed to Drilled and Cased
1978-10-18 Production Casing Operation Performed
1978-11-03 Perforation Treatment Performed - Bullet Perforation
1978-11-03 Perforation Treatment Performed - Selective Bullet Perforations
1979-07-07 Perforation Treatment Performed - Selective Bullet Perforations
1979-08-11 Perforation Treatment Performed - Fractured
1979-10-08 Perforation Treatment Performed - Selective Bullet Perforations
1979-12-04 Well Began Production
1979-12-04 Well Fluid changed to Gas
1979-12-04 Well Mode changed to Flowing
1980-10-26 Perforation Treatment Performed - Fractured
1987-01-06 Well Structure changed to Commingled
1990-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-11-01 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-11-03 Selective Bullet Perforations 750.00 750.50 0
1979-07-07 Selective Bullet Perforations 513.50 514.50 0
1979-07-07 Selective Bullet Perforations 515.50 516.50 0
1979-07-07 Selective Bullet Perforations 517.50 518.50 0
1979-07-07 Selective Bullet Perforations 519.50 520.50 0
1979-07-07 Selective Bullet Perforations 521.50 529.50 0
1979-07-07 Selective Bullet Perforations 533.50 539.00 0
1979-08-11 Fracture 508.00 539.00 0
1979-10-08 Selective Bullet Perforations 488.50 489.00 0
1979-10-08 Selective Bullet Perforations 489.50 490.00 0
1979-10-08 Selective Bullet Perforations 490.50 491.00 0
1978-11-03 Selective Bullet Perforations 751.00 752.50 0
1979-10-08 Selective Bullet Perforations 491.50 492.00 0
1979-10-08 Selective Bullet Perforations 492.50 493.00 0
1979-10-08 Selective Bullet Perforations 493.50 494.00 0
1979-10-08 Selective Bullet Perforations 495.00 496.00 0
1979-10-08 Selective Bullet Perforations 496.50 497.50 0
1979-10-08 Selective Bullet Perforations 499.00 505.00 0
1980-10-26 Fracture 488.50 505.00 0
1990-11-01 Packing Device Capped w/Cement 717.00 725.00 0
1978-11-03 Selective Bullet Perforations 753.00 753.00 0
1978-11-03 Bullet Perforation 751.40 752.30 14
1979-07-07 Selective Bullet Perforations 508.00 508.50 0
1979-07-07 Selective Bullet Perforations 509.00 509.50 0
1979-07-07 Selective Bullet Perforations 510.00 510.50 0
1979-07-07 Selective Bullet Perforations 511.00 511.50 0
1979-07-07 Selective Bullet Perforations 512.00 512.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 662 0.0 0.0 0.0
1980 7079 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 8018 0.0 0.0 0.0
1983 5087 0.0 0.0 0.0
1984 7425 0.0 0.0 0.0
1985 7156 0.0 0.0 0.0
1986 6741 0.0 0.0 0.0

For data sources see[5]

References