X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154220816000

Well Details

Well ID: 0154220816000
Loading map...
Location: 00/16-08-015-22W4/0
Location Alias: 00/16-08-15-22 W4M
Location Alias 2: 00/16-08-015-22 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 22
Section: 08
County/Municipality: Vulcan County
Well Name: TORINO ET AL LONG COULEE 16-8-15-22
Operator Name: Thoroughbred Energy Ltd.
License Number: 0087295
License Date: 1980-11-27
License Status: Abandoned
Spud Date: 1980-11-28
Final Drill Date: 1980-12-19
Well Total Depth: 1528.00 m
Surface Hole Latitude: 50.248665
Surface Hole Longitude: -112.988274

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-27 Obtained License
1980-12-19 Finished Drilling
1980-12-19 Well Mode changed to Drilled and Cased
1980-12-20 Drill Stem Test Performed
1980-12-21 Drill Stem Test Performed
1980-12-22 Production Casing Operation Performed
1981-02-18 Perforation Treatment Performed - Jet Perforation
1981-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-03 Perforation Treatment Performed - Fractured
1981-03-03 Perforation Treatment Performed - Jet Perforation
1981-07-12 Well Began Production
1981-07-12 Well Fluid changed to Crude Oil
1981-07-12 Well Mode changed to Pumping
2001-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-28 Plug Back Performed
2001-08-28 Well Fluid changed to Crude Oil
2001-08-28 Well Mode changed to Abandoned Zone
2017-10-24 Well Abandoned
2017-10-24 Well Fluid changed to Crude Oil
2017-10-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-18 Perforation 1490.50 1493.00 13
1981-03-02 Acid Treatment 1490.50 1493.00 0
1981-03-03 Perforation 1490.50 1493.00 13
1981-03-03 Fracture 1490.50 1493.00 0
2001-08-28 Packing Device Capped w/Cement 1472.00 1480.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 4185 0.0 0.0 0.0
1982 8674 0.0 0.0 0.0
1983 8626 0.0 0.0 0.0
1984 8351 0.0 0.0 0.0
1985 8058 0.0 0.0 0.0
1986 8367 0.0 0.0 0.0
1987 7873 0.0 0.0 0.0
1988 8523 0.0 0.0 0.0
1989 7535 0.0 0.0 0.0
1990 8196 0.0 0.0 0.0
1991 8718 0.0 0.0 0.0
1992 8279 0.0 0.0 0.0
1993 7295 0.0 0.0 0.0
1994 2666 0.0 0.0 0.0
1995 5435 0.0 0.0 0.0
1996 1318 0.0 0.0 0.0
1997 216 0.0 0.0 0.0
2000 1815 0.0 0.0 0.0

For data sources see[5]

References