If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0154192603002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.283975,"lon":-112.517465,"icon":""}]} |
| Location: 00/03-26-015-19W4/2 | |
| Location Alias: 00/03-26-15-19 W4M | |
| Location Alias 2: 00/03-26-015-19 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 015 | |
| Meridian: 4 | |
| Range: 19 | |
| Section: 26 | |
| County/Municipality: Vulcan County | |
| Well Name: CWNG ET AL LBOW 3-26-15-19 | |
| Operator Name: ATCO Gas And Pipelines Ltd. | |
| License Number: 0077418 | |
| License Date: 1979-08-10 | |
| License Status: RecCertified | |
| Spud Date: 1979-08-14 | |
| Final Drill Date: 1979-08-20 | |
| Well Total Depth: 1220.00 m | |
| Surface Hole Latitude: 50.283975 | |
| Surface Hole Longitude: -112.517465 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1979-08-10 | Obtained License |
| 1979-08-20 | Finished Drilling |
| 1979-08-21 | Drill Stem Test Performed |
| 1979-08-21 | Well Log Performed |
| 1979-08-22 | Drill Stem Test Performed |
| 1979-08-23 | Drill Stem Test Performed |
| 1979-08-24 | Drill Stem Test Performed |
| 1979-08-25 | Drill Stem Test Performed |
| 1979-08-26 | Production Casing Operation Performed |
| 1980-10-30 | Perforation Treatment Performed - Jet Perforation |
| 1980-11-03 | Perforation Treatment Performed - Cement Squeeze |
| 1980-11-04 | Perforation Treatment Performed - Jet Perforation |
| 1980-11-06 | Perforation Treatment Performed - Jet Perforation |
| 1980-11-06 | Well Mode changed to Drilled and Cased |
| 1984-05-01 | Well Began Production |
| 1984-05-01 | Well Fluid changed to Gas |
| 1984-05-01 | Well Mode changed to Flowing |
| 1984-05-20 | Perforation Treatment Performed - Jet Perforation |
| 1985-09-21 | Perforation Treatment Performed - Cement Squeeze |
| 1985-09-21 | Plug Back Performed |
| 1985-09-21 | Well Fluid changed to Gas |
| 1985-09-21 | Well Mode changed to Flowing |
| 1985-09-23 | Perforation Treatment Performed - Jet Perforation |
| 1987-12-23 | Well Fluid changed to Gas |
| 1987-12-23 | Well Mode changed to Suspended |
| 1988-11-01 | Perforation Treatment Performed - Jet Perforation |
| 1988-11-01 | Well Log Performed |
| 1988-11-08 | Well Fluid changed to Gas |
| 1988-11-08 | Well Mode changed to Suspended |
| 1990-08-09 | Well Log Performed |
| 1990-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1990-08-10 | Plug Back Performed |
| 1990-08-11 | Perforation Treatment Performed - Cement Squeeze |
| 1990-08-11 | Plug Back Performed |
| 1990-08-11 | Well Fluid changed to Gas |
| 1990-08-11 | Well Mode changed to Abandoned |
| 1990-08-12 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1980-10-30 | Perforation | 1189.00 | 1190.00 | 7 |
| 1985-09-21 | Cement Squeeze | 906.50 | 908.00 | 0 |
| 1985-09-23 | Perforation | 946.00 | 948.00 | 13 |
| 1985-09-23 | Perforation | 960.50 | 962.50 | 13 |
| 1985-09-23 | Perforation | 964.00 | 966.00 | 13 |
| 1988-11-01 | Perforation | 1159.00 | 1160.00 | 13 |
| 1990-08-10 | Packing Device Capped w/Cement | 1165.00 | 1173.00 | 0 |
| 1990-08-10 | Packing Device Capped w/Cement | 1132.00 | 1140.00 | 0 |
| 1990-08-11 | Cement Squeeze | 946.00 | 977.50 | 0 |
| 1980-11-03 | Cement Squeeze | 1189.00 | 1190.00 | 0 |
| 1980-11-04 | Perforation | 1185.00 | 1187.00 | 7 |
| 1980-11-06 | Perforation | 964.00 | 966.00 | 7 |
| 1984-05-20 | Perforation | 976.50 | 977.50 | 13 |
| 1984-05-20 | Perforation | 973.50 | 974.50 | 13 |
| 1984-05-20 | Perforation | 960.50 | 962.00 | 13 |
| 1984-05-20 | Perforation | 946.50 | 947.50 | 13 |
| 1984-05-20 | Perforation | 906.50 | 908.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1984 | 3364 | 0.0 | 0.0 | 0.0 |
| 1985 | 5367 | 0.0 | 0.0 | 0.0 |
| 1986 | 8600 | 0.0 | 0.0 | 0.0 |
| 1987 | 7897 | 0.0 | 0.0 | 0.0 |
| 1988 | 85 | 0.0 | 0.0 | 0.0 |
For data sources see[5]