If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154191701000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.254259,"lon":-112.575729,"icon":""}]} |
Location: 00/01-17-015-19W4/0 | |
Location Alias: 00/01-17-15-19 W4M | |
Location Alias 2: 00/01-17-015-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 19 | |
Section: 17 | |
County/Municipality: Vulcan County | |
Well Name: CELTIC LBOW 1-17-15-19 | |
Operator Name: XTO Energy Canada ULC | |
License Number: 0311389 | |
License Date: 2004-07-07 | |
License Status: Abandoned | |
Spud Date: 2004-07-21 | |
Final Drill Date: 2004-07-24 | |
Well Total Depth: 1210.00 m | |
Surface Hole Latitude: 50.254259 | |
Surface Hole Longitude: -112.575729 |
Date | Event |
---|---|
2004-07-07 | Obtained License |
2004-07-23 | Surface Casing Operation Performed |
2004-07-24 | Finished Drilling |
2004-07-24 | Well Mode changed to Drilled and Cased |
2004-07-25 | Well Log Performed |
2004-07-26 | Production Casing Operation Performed |
2004-07-26 | Rig Released |
2009-11-14 | Well Log Performed |
2009-11-17 | Well Log Performed |
2010-09-15 | Well Log Performed |
2010-09-29 | Well Log Performed |
2010-10-02 | Well Log Performed |
2012-03-17 | Well Log Performed |
2014-11-24 | Perforation Treatment Performed - Jet Perforation |
2014-11-24 | Well Log Performed |
2014-11-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-11-26 | Perforation Treatment Performed - Cement Plug |
2014-11-26 | Plug Back Performed |
2014-11-27 | Perforation Treatment Performed - Jet Perforation |
2014-11-27 | Well Log Performed |
2014-12-03 | Perforation Treatment Performed - Cement Squeeze |
2014-12-03 | Perforation Treatment Performed - Jet Perforation |
2014-12-03 | Well Log Performed |
2014-12-04 | Perforation Treatment Performed - Cement Squeeze |
2014-12-05 | Perforation Treatment Performed - Jet Perforation |
2014-12-05 | Well Log Performed |
2014-12-07 | Perforation Treatment Performed - Cement Squeeze |
2014-12-08 | Well Log Performed |
2015-02-28 | Perforation Treatment Performed - Jet Perforation |
2015-02-28 | Well Log Performed |
2015-03-02 | Perforation Treatment Performed - Cement Squeeze |
2015-03-03 | Well Log Performed |
2015-03-04 | Perforation Treatment Performed - Cement Plug |
2015-03-04 | Well Log Performed |
2015-03-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2015-03-05 | Perforation Treatment Performed - Cement Squeeze |
2015-03-05 | Perforation Treatment Performed - Jet Perforation |
2015-03-05 | Plug Back Performed |
2015-03-05 | Well Log Performed |
2015-03-05 | Well Mode changed to Abandoned Zone |
2015-06-05 | Well Abandoned |
2015-06-05 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-11-24 | Perforation | 580.00 | 581.00 | 17 |
2014-12-05 | Perforation | 250.00 | 251.00 | 17 |
2014-12-05 | Perforation | 250.00 | 251.00 | 99 |
2014-12-05 | Perforation | 220.00 | 220.20 | 12 |
2014-12-07 | Cement Squeeze | 250.00 | 251.00 | 0 |
2015-02-28 | Perforation | 242.00 | 243.00 | 17 |
2015-02-28 | Perforation | 242.00 | 243.00 | 99 |
2015-03-02 | Cement Squeeze | 242.00 | 243.00 | 0 |
2015-03-04 | Cement Plug | 120.00 | 240.00 | 0 |
2015-03-05 | Perforation | 100.00 | 100.30 | 36 |
2015-03-05 | Perforation | 79.00 | 79.30 | 36 |
2014-11-26 | Cement Plug | 633.00 | 927.50 | 0 |
2015-03-05 | Cement Squeeze | 79.00 | 100.30 | 0 |
2015-03-05 | Packing Device Capped w/Cement | 74.80 | 75.30 | 0 |
2014-11-26 | Packing Device Capped w/Cement | 402.00 | 570.90 | 0 |
2014-11-27 | Perforation | 360.00 | 361.00 | 17 |
2014-11-27 | Perforation | 360.00 | 361.00 | 99 |
2014-12-03 | Perforation | 310.00 | 311.00 | 17 |
2014-12-03 | Perforation | 310.00 | 311.00 | 99 |
2014-12-03 | Cement Squeeze | 360.00 | 361.00 | 0 |
2014-12-04 | Cement Squeeze | 310.00 | 311.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-03-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]