X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154191108000

Well Details

Well ID: 0154191108000
Loading map...
Location: 00/08-11-015-19W4/0
Location Alias: 00/08-11-15-19 W4M
Location Alias 2: 00/08-11-015-19 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 19
Section: 11
County/Municipality: Municipal District of Taber
Well Name: SLE LBOW 8-11-15-19
Operator Name: SanLing Energy Ltd.
License Number: 0071881
License Date: 1978-09-12
License Status: Abandoned
Spud Date: 1978-10-23
Final Drill Date: 1978-10-29
Well Total Depth: 1208.00 m
Surface Hole Latitude: 50.243644
Surface Hole Longitude: -112.507004

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-09-12 Obtained License
1978-10-29 Finished Drilling
1978-10-29 Well Mode changed to Drilled and Cased
1978-10-30 Drill Stem Test Performed
1978-10-31 Drill Stem Test Performed
1978-11-01 Drill Stem Test Performed
1978-11-02 Water Flow Occurred
1978-11-03 Kick Occurred
1978-11-06 Production Casing Operation Performed
1978-11-14 Perforation Treatment Performed - Jet Perforation
1978-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-29 Well Began Production
1978-11-29 Well Fluid changed to Crude Oil
1978-11-29 Well Mode changed to Pumping
1979-12-01 Well Fluid changed to Crude Oil
1979-12-01 Well Mode changed to Suspended
1984-07-24 Perforation Treatment Performed - Jet Perforation
1984-07-24 Well Log Performed
1984-11-01 Well Fluid changed to Crude Oil
1984-11-01 Well Mode changed to Suspended
1998-02-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-06 Plug Back Performed
1998-02-06 Well Fluid changed to Crude Oil
1998-02-06 Well Mode changed to Abandoned Zone
2002-06-27 Well Log Performed
2002-06-28 Perforation Treatment Performed - Jet Perforation
2002-07-03 Well Log Performed
2002-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-04 Plug Back Performed
2002-07-07 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-11-14 Perforation 1165.00 1165.50 14
1978-11-15 Acid Treatment 1165.00 1165.50 0
1984-07-24 Perforation 1139.00 1141.00 7
1998-02-06 Packing Device Capped w/Cement 1147.00 1155.00 0
2002-06-28 Perforation 1158.00 1162.00 17
2002-07-04 Packing Device Capped w/Cement 1147.00 1156.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 792 0.0 0.0 0.0
1979 6808 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-11-02 Water Flow 1208.00 0.00
1978-11-03 Kick 1208.00 1208.00

For data sources see[6]

References