X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154153315002

Well Details

Well ID: 0154153315002
Loading map...
Location: 00/15-33-015-15W4/2
Location Alias: 00/15-33-15-15 W4M
Location Alias 2: 00/15-33-015-15 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 33
County/Municipality: County of Newell
Well Name: CVE ALDSON 15-33-15-15
Operator Name: Cenovus Energy Inc.
License Number: 0045583
License Date: 1973-04-23
License Status: RecCertified
Spud Date: 1973-04-25
Final Drill Date: 1973-04-30
Well Total Depth: 1055.20 m
Surface Hole Latitude: 50.306777
Surface Hole Longitude: -112.006139

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-04-23 Obtained License
1973-04-30 Finished Drilling
1973-04-30 Well Mode changed to Drilled and Cased
1973-05-01 Drill Stem Test Performed
1973-05-02 Drill Stem Test Performed
1973-05-03 Production Casing Operation Performed
1973-06-08 Perforation Treatment Performed - Jet Perforation
1973-06-12 Perforation Treatment Performed - Fractured
1992-07-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-06 Plug Back Performed
1992-07-08 Perforation Treatment Performed - Jet Perforation
1992-07-08 Well Log Performed
1992-07-10 Perforation Treatment Performed - Jet Perforation
1992-07-21 Well Began Production
1992-07-21 Well Fluid changed to Gas
1992-07-21 Well Mode changed to Flowing
1994-03-31 Well Fluid changed to Gas
1994-03-31 Well Mode changed to Suspended
1994-10-21 Well Log Performed
1994-10-22 Perforation Treatment Performed - Jet Perforation
1994-10-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-26 Perforation Treatment Performed - Cement Squeeze
1994-10-27 Well Log Performed
1994-10-28 Perforation Treatment Performed - Jet Perforation
1994-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-29 Perforation Treatment Performed - Cement Squeeze
1995-05-07 Well Log Performed
1995-05-08 Well Log Performed
1995-05-09 Well Log Performed
1995-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-06-10 Perforation Treatment Performed - Jet Perforation
1995-06-11 Perforation Treatment Performed - Cement Plug
1995-06-11 Perforation Treatment Performed - Cement Squeeze
1995-06-11 Plug Back Performed
1995-06-11 Well Fluid changed to Gas
1995-06-11 Well Mode changed to Abandoned Zone
1995-07-17 Well Abandoned
1995-07-17 Well Fluid changed to Gas
1995-07-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-06-08 Perforation 1027.20 1029.00 7
1994-10-26 Cement Squeeze 202.50 203.50 0
1994-10-28 Perforation 183.20 184.20 13
1994-10-29 Acid Treatment 183.20 184.20 0
1994-10-29 Cement Squeeze 183.20 184.20 0
1995-06-10 Perforation 183.20 184.20 13
1995-06-10 Acid Treatment 183.20 184.20 0
1995-06-11 Cement Squeeze 183.20 184.20 0
1995-06-11 Cement Plug 0.10 1007.00 0
1973-06-08 Perforation 1029.30 1030.50 7
1973-06-08 Perforation 1030.80 1031.40 7
1973-06-12 Fracture 1027.20 1031.40 0
1992-07-06 Packing Device Capped w/Cement 1007.00 1015.00 0
1992-07-08 Perforation 1002.50 1004.50 13
1992-07-10 Perforation 1002.50 1004.50 13
1994-10-22 Perforation 202.50 203.50 13
1994-10-26 Acid Treatment 202.50 203.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 3918 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 1416 0.0 0.0 0.0

For data sources see[5]

References