X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154153313000

Well Details

Well ID: 0154153313000
Loading map...
Location: 00/13-33-015-15W4/0
Location Alias: 00/13-33-15-15 W4M
Location Alias 2: 00/13-33-015-15 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 33
County/Municipality: County of Newell
Well Name: CVE ALDSON 13-33-15-15
Operator Name: Cenovus Energy Inc.
License Number: 0102968
License Date: 1983-09-08
License Status: RecCertified
Spud Date: 1983-10-06
Final Drill Date: 1983-10-09
Well Total Depth: 1067.00 m
Surface Hole Latitude: 50.308357
Surface Hole Longitude: -112.018107

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-09-08 Obtained License
1983-10-09 Finished Drilling
1983-10-09 Well Mode changed to Drilled and Cased
1983-10-10 Drill Stem Test Performed
1983-10-11 Production Casing Operation Performed
1983-10-21 Perforation Treatment Performed - Jet Perforation
1983-12-03 Well Began Production
1983-12-03 Well Fluid changed to Crude Oil
1983-12-03 Well Mode changed to Flowing
1987-01-01 Well Fluid changed to Crude Oil
1987-01-01 Well Mode changed to Suspended
1993-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-05-17 Plug Back Performed
1993-05-18 Perforation Treatment Performed - Jet Perforation
1993-05-18 Perforation Treatment Performed - Remedial Casing
1993-05-18 Well Log Performed
1993-08-04 Well Log Performed
1993-08-05 Perforation Treatment Performed - Jet Perforation
1993-08-05 Perforation Treatment Performed - Remedial Casing
1993-12-08 Well Abandoned
1993-12-08 Well Fluid changed to Crude Oil
1993-12-08 Well Mode changed to Abandoned
1995-07-21 Well Log Performed
1995-08-30 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-10-21 Perforation 1014.00 1016.00 13
1993-05-17 Packing Device Capped w/Cement 989.00 997.00 0
1993-05-18 Perforation 253.00 254.00 7
1993-05-18 Remedial Casing Cementing 253.00 254.00 0
1993-08-05 Perforation 248.00 249.00 7
1993-08-05 Remedial Casing Cementing 248.00 249.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 696 0.0 0.0 0.0
1984 5461 0.0 0.0 0.0
1985 7915 0.0 0.0 0.0
1986 5514 0.0 0.0 0.0

For data sources see[5]

References