X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154153307000

Well Details

Well ID: 0154153307000
Loading map...
Location: 00/07-33-015-15W4/0
Location Alias: 00/07-33-15-15 W4M
Location Alias 2: 00/07-33-015-15 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 33
County/Municipality: County of Newell
Well Name: CVE ALDSON 7-33-15-15
Operator Name: Cenovus Energy Inc.
License Number: 0046310
License Date: 1973-06-26
License Status: RecCertified
Spud Date: 1973-07-06
Final Drill Date: 1973-07-10
Well Total Depth: 1047.30 m
Surface Hole Latitude: 50.300684
Surface Hole Longitude: -112.006141

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-06-26 Obtained License
1973-07-10 Finished Drilling
1973-07-12 Drill Stem Test Performed
1973-07-12 Production Casing Operation Performed
1974-03-25 Well Mode changed to Drilled and Cased
1982-04-09 Perforation Treatment Performed - Jet Perforation
1982-04-18 Perforation Treatment Performed - Cement Squeeze
1982-04-18 Perforation Treatment Performed - Jet Perforation
1982-04-21 Perforation Treatment Performed - Jet Perforation
1982-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-14 Perforation Treatment Performed - Jet Perforation
1984-09-17 Perforation Treatment Performed - Fractured
1984-09-26 Well Began Production
1984-09-26 Well Fluid changed to Crude Oil
1984-09-26 Well Mode changed to Flowing
1992-02-01 Well Fluid changed to Crude Oil
1992-02-01 Well Mode changed to Suspended
1993-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-31 Plug Back Performed
1993-11-01 Perforation Treatment Performed - Jet Perforation
1993-11-01 Well Log Performed
1993-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-02 Perforation Treatment Performed - Remedial Casing
1993-11-25 Well Log Performed
1993-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-26 Perforation Treatment Performed - Jet Perforation
1993-11-26 Perforation Treatment Performed - Remedial Casing
1993-11-26 Well Log Performed
1993-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-12-07 Perforation Treatment Performed - Jet Perforation
1993-12-07 Well Log Performed
1993-12-08 Perforation Treatment Performed - Remedial Casing
1994-01-12 Perforation Treatment Performed - Jet Perforation
1994-01-12 Well Log Performed
1994-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-01-15 Perforation Treatment Performed - Remedial Casing
1994-02-08 Well Log Performed
1994-02-09 Perforation Treatment Performed - Jet Perforation
1994-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-02-11 Perforation Treatment Performed - Remedial Casing
1994-02-11 Well Fluid changed to Crude Oil
1994-02-11 Well Mode changed to Abandoned
1994-07-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-04-09 Perforation 1021.70 1023.50 7
1993-11-02 Acid Treatment 330.00 331.00 0
1993-11-02 Remedial Casing Cementing 330.00 331.00 0
1993-11-26 Perforation 269.00 270.00 13
1993-11-26 Acid Treatment 269.00 270.00 0
1993-11-26 Remedial Casing Cementing 269.00 270.00 0
1993-12-07 Perforation 359.00 360.00 13
1993-12-07 Acid Treatment 359.00 360.00 0
1993-12-08 Remedial Casing Cementing 359.00 360.00 0
1994-01-12 Perforation 251.80 252.80 13
1994-01-14 Acid Treatment 251.80 252.80 0
1982-04-18 Perforation 1018.00 1018.30 13
1994-01-15 Remedial Casing Cementing 251.80 252.80 0
1994-02-09 Perforation 191.00 192.00 13
1994-02-10 Acid Treatment 191.00 192.00 0
1994-02-11 Remedial Casing Cementing 191.00 192.00 0
1982-04-18 Cement Squeeze 1018.00 1023.50 0
1982-04-21 Perforation 1022.00 1023.50 7
1982-04-23 Acid Treatment 1022.00 1023.50 0
1984-09-14 Perforation 1021.50 1024.00 13
1984-09-17 Fracture 1021.50 1024.00 0
1993-10-31 Packing Device Capped w/Cement 1004.00 1012.00 0
1993-11-01 Perforation 330.00 331.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1556 0.0 0.0 0.0
1985 2233 0.0 0.0 0.0
1986 7878 0.0 0.0 0.0
1987 6590 0.0 0.0 0.0
1988 4373 0.0 0.0 0.0
1989 1763 0.0 0.0 0.0
1990 593 0.0 0.0 0.0
1991 64 0.0 0.0 0.0
1992 24 0.0 0.0 0.0

For data sources see[5]

References