If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0154153302022 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
| Location: 02/02-33-015-15W4/2 | |
| Location Alias: 02/02-33-15-15 W4M | |
| Location Alias 2: 02/02-33-015-15 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 015 | |
| Meridian: 4 | |
| Range: 15 | |
| Section: 33 | |
| County/Municipality: County of Newell | |
| Well Name: CVE ALDSON 2-33-15-15 | |
| Operator Name: Cenovus Energy Inc. | |
| License Number: 0102971 | |
| License Date: 1983-09-08 | |
| License Status: RecCertified | |
| Spud Date: 1983-10-11 | |
| Final Drill Date: 1983-10-14 | |
| Well Total Depth: 1075.00 m | |
| Surface Hole Latitude: 50.298861 | |
| Surface Hole Longitude: -112.008576 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1983-09-08 | Obtained License |
| 1983-10-14 | Finished Drilling |
| 1983-10-14 | Well Mode changed to Drilled and Cased |
| 1983-10-15 | Drill Stem Test Performed |
| 1983-10-16 | Drill Stem Test Performed |
| 1983-10-16 | Production Casing Operation Performed |
| 1983-10-25 | Perforation Treatment Performed - Jet Perforation |
| 1984-06-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1984-06-19 | Plug Back Performed |
| 1984-06-20 | Perforation Treatment Performed - Jet Perforation |
| 1984-06-20 | Well Log Performed |
| 1984-06-26 | Well Began Production |
| 1984-06-26 | Well Fluid changed to Crude Oil |
| 1984-06-26 | Well Mode changed to Pumping |
| 1992-02-01 | Well Fluid changed to Crude Oil |
| 1992-02-01 | Well Mode changed to Suspended |
| 1992-10-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1992-10-06 | Plug Back Performed |
| 1992-10-06 | Well Fluid changed to Crude Oil |
| 1992-10-06 | Well Mode changed to Abandoned |
| 1992-10-08 | Well Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1983-10-25 | Perforation | 1037.00 | 1040.50 | 11 |
| 1983-10-25 | Perforation | 1043.00 | 1044.50 | 11 |
| 1984-06-19 | Packing Device Capped w/Cement | 1025.00 | 1033.00 | 0 |
| 1984-06-20 | Perforation | 1009.50 | 1012.50 | 13 |
| 1992-10-06 | Packing Device Capped w/Cement | 992.00 | 1000.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1984 | 4144 | 0.0 | 0.0 | 0.0 |
| 1985 | 7380 | 0.0 | 0.0 | 0.0 |
| 1986 | 8011 | 0.0 | 0.0 | 0.0 |
| 1987 | 7501 | 0.0 | 0.0 | 0.0 |
| 1988 | 7735 | 0.0 | 0.0 | 0.0 |
| 1989 | 7850 | 0.0 | 0.0 | 0.0 |
| 1990 | 7716 | 0.0 | 0.0 | 0.0 |
| 1991 | 4454 | 0.0 | 0.0 | 0.0 |
| 1992 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]