X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154153302020

Well Details

Well ID: 0154153302020
Loading map...
Location: 02/02-33-015-15W4/0
Location Alias: 02/02-33-15-15 W4M
Location Alias 2: 02/02-33-015-15 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 33
County/Municipality: County of Newell
Well Name: CVE ALDSON 2-33-15-15
Operator Name: Cenovus Energy Inc.
License Number: 0102971
License Date: 1983-09-08
License Status: RecCertified
Spud Date: 1983-10-11
Final Drill Date: 1983-10-14
Well Total Depth: 1075.00 m
Surface Hole Latitude: 50.298861
Surface Hole Longitude: -112.008576

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-09-08 Obtained License
1983-10-14 Finished Drilling
1983-10-14 Well Mode changed to Drilled and Cased
1983-10-15 Drill Stem Test Performed
1983-10-16 Drill Stem Test Performed
1983-10-16 Production Casing Operation Performed
1983-10-25 Perforation Treatment Performed - Jet Perforation
1984-02-01 Well Began Production
1984-02-01 Well Fluid changed to Crude Oil
1984-02-01 Well Mode changed to Pumping
1984-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-06-19 Plug Back Performed
1984-06-19 Well Fluid changed to Crude Oil
1984-06-19 Well Mode changed to Abandoned Zone
1984-06-20 Perforation Treatment Performed - Jet Perforation
1984-06-20 Well Log Performed
1992-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-10-06 Plug Back Performed
1992-10-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-10-25 Perforation 1037.00 1040.50 11
1983-10-25 Perforation 1043.00 1044.50 11
1984-06-19 Packing Device Capped w/Cement 1025.00 1033.00 0
1984-06-20 Perforation 1009.50 1012.50 13
1992-10-06 Packing Device Capped w/Cement 992.00 1000.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 818 0.0 0.0 0.0

For data sources see[5]

References