X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154152310000

Well Details

Well ID: 0154152310000
Loading map...
Location: 00/10-23-015-15W4/0
Location Alias: 00/10-23-15-15 W4M
Location Alias 2: 00/10-23-015-15 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 23
County/Municipality: County of Newell
Well Name: TXNE 10B ALDSON 10-23-15-15
Operator Name: Torxen Energy Ltd.
License Number: 0221333
License Date: 1999-02-08
License Status: Suspension
Spud Date: 1999-02-13
Final Drill Date: 1999-02-18
Well Total Depth: 1238.00 m
Surface Hole Latitude: 50.272643
Surface Hole Longitude: -111.953126

For data sources see[1][2]

Well History

Date Event
1999-02-08 Obtained License
1999-02-14 Direction Drilling Operation Performed - Deviate
1999-02-14 Surface Casing Operation Performed
1999-02-14 Well Log Performed
1999-02-18 Finished Drilling
1999-02-19 Production Casing Operation Performed
1999-02-19 Well Log Performed
1999-02-20 Rig Released
1999-02-20 Well Mode changed to Drilled and Cased
1999-03-03 Well Log Performed
1999-11-23 Perforation Treatment Performed - Jet Perforation
1999-11-23 Well Log Performed
1999-12-01 Well Log Performed
1999-12-15 Perforation Treatment Performed - Fractured
2000-11-01 Well Began Production
2000-11-01 Well Fluid changed to Gas
2000-11-01 Well Mode changed to Flowing
2003-09-18 Well Log Performed
2003-09-19 Perforation Treatment Performed - Cement Squeeze
2003-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-21 Perforation Treatment Performed - Jet Perforation
2003-09-21 Plug Back Performed
2003-09-21 Well Fluid changed to Gas
2003-09-21 Well Mode changed to Abandoned Zone
2003-09-22 Well Log Performed
2003-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-17 Perforation Treatment Performed - Jet Perforation
2003-10-17 Plug Back Performed
2003-10-17 Well Log Performed
2004-02-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-29 Plug Back Performed
2004-02-29 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-02-14 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-11-23 Perforation 1174.20 1175.80 20
1999-12-15 Fracture 1174.20 1175.80 0
2003-09-19 Cement Squeeze 1174.20 1175.80 0
2003-09-21 Packing Device Capped w/Cement 1149.00 1152.00 0
2003-09-21 Perforation 1110.00 1113.00 17
2003-10-17 Packing Device Capped w/Cement 1102.00 1105.00 0
2003-10-17 Perforation 943.50 946.00 17
2004-02-29 Packing Device Capped w/Cement 936.00 939.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 131 0.0 0.0 0.0
2001 2537 0.0 0.0 0.0
2002 706 0.0 0.0 0.0
2003 40 0.0 0.0 0.0

For data sources see[6]

References