X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154152010002

Well Details

Well ID: 0154152010002
Loading map...
Location: 00/10-20-015-15W4/2
Location Alias: 00/10-20-15-15 W4M
Location Alias 2: 00/10-20-015-15 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 20
County/Municipality: County of Newell
Well Name: TXNE ALDSON 10-20-15-15
Operator Name: Torxen Energy Ltd.
License Number: 0125947
License Date: 1987-02-23
License Status: Suspension
Spud Date: 1987-02-27
Final Drill Date: 1987-03-02
Well Total Depth: 1057.00 m
Surface Hole Latitude: 50.275916
Surface Hole Longitude: -112.031299

For data sources see[1][2]

Well History

Date Event
1987-02-23 Obtained License
1987-02-28 Surface Casing Operation Performed
1987-03-02 Finished Drilling
1987-03-02 Well Log Performed
1987-03-02 Well Mode changed to Drilled and Cased
1987-03-03 Drill Stem Test Performed
1987-03-03 Well Log Performed
1987-03-04 Production Casing Operation Performed
1987-03-04 Rig Released
1987-08-28 Well Log Performed
1987-08-29 Perforation Treatment Performed - Jet Perforation
1998-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-17 Perforation Treatment Performed - Jet Perforation
1998-11-17 Plug Back Performed
1998-11-17 Well Log Performed
1999-02-09 Well Began Production
1999-02-09 Well Fluid changed to Water
1999-02-09 Well Type changed to Source
1999-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-03 Plug Back Performed
1999-11-03 Well Fluid changed to Water
1999-11-03 Well Mode changed to Abandoned Zone
1999-11-03 Well Type changed to Source

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-08-29 Perforation 981.80 982.80 13
1998-11-17 Perforation 830.50 833.00 17
1998-11-17 Packing Device Capped w/Cement 971.00 979.00 0
1999-11-03 Packing Device Capped w/Cement 739.00 749.00 0
1987-08-29 Perforation 985.00 988.00 13
1987-08-29 Perforation 990.50 994.00 13
1987-08-29 Perforation 995.00 997.00 13
1998-11-17 Perforation 754.00 757.00 17
1998-11-17 Perforation 768.50 770.50 17
1998-11-17 Perforation 789.20 794.00 17
1998-11-17 Perforation 794.00 799.00 17
1998-11-17 Perforation 824.00 828.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 2298 0.0 0.0 0.0

For data sources see[5]

References