X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154151716000

Well Details

Well ID: 0154151716000
Loading map...
Location: 00/16-17-015-15W4/0
Location Alias: 00/16-17-15-15 W4M
Location Alias 2: 00/16-17-015-15 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 15
Section: 17
County/Municipality: County of Newell
Well Name: TXNE ALDSON 16-17-15-15
Operator Name: Torxen Energy Ltd.
License Number: 0137675
License Date: 1988-12-15
License Status: Abandoned
Spud Date: 1988-12-19
Final Drill Date: 1988-12-30
Well Total Depth: 1035.00 m
Surface Hole Latitude: 50.265856
Surface Hole Longitude: -112.026252

For data sources see[1][2]

Well History

Date Event
1988-12-15 Obtained License
1988-12-20 Surface Casing Operation Performed
1988-12-30 Finished Drilling
1988-12-30 Well Log Performed
1988-12-31 Drill Stem Test Performed
1989-01-01 Production Casing Operation Performed
1989-01-01 Rig Released
1989-02-16 Well Log Performed
1989-02-17 Perforation Treatment Performed - Jet Perforation
1989-02-18 Perforation Treatment Performed - Jet Perforation
1989-03-22 Perforation Treatment Performed - Fractured
1989-04-05 Well Mode changed to Drilled and Cased
1989-07-20 Well Began Production
1989-07-20 Well Fluid changed to Crude Oil
1989-07-20 Well Mode changed to Flowing
1990-07-09 Perforation Treatment Performed - Chemical Squeeze
1991-03-12 Well Fluid changed to Crude Oil
1991-03-12 Well Mode changed to Pumping
1995-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-01 Plug Back Performed
1995-06-02 Well Abandoned
1995-06-02 Well Fluid changed to Crude Oil
1995-06-02 Well Mode changed to Abandoned
1995-07-13 Well Log Performed
1995-07-14 Well Log Performed
1995-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-15 Perforation Treatment Performed - Jet Perforation
1995-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-07-17 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-02-17 Perforation 991.00 994.50 13
1995-07-17 Packing Device Capped w/Cement 164.30 178.00 0
1989-02-18 Perforation 982.00 985.50 13
1989-03-22 Fracture 982.00 985.50 0
1990-07-09 Chemical Squeeze 982.00 994.50 0
1995-06-01 Packing Device Capped w/Cement 964.00 972.00 0
1995-07-15 Perforation 184.00 185.00 13
1995-07-15 Acid Treatment 184.00 185.00 0
1995-07-16 Acid Treatment 184.00 185.00 0
1995-07-17 Remedial Casing Cementing 184.00 185.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 2735 0.0 0.0 0.0
1990 3776 0.0 0.0 0.0
1991 5347 0.0 0.0 0.0
1992 8079 0.0 0.0 0.0
1993 7469 0.0 0.0 0.0
1994 7859 0.0 0.0 0.0
1995 1552 0.0 0.0 0.0

For data sources see[5]

References