If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154151708020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.25972,"lon":-112.021942,"icon":""}]} |
Location: 02/08-17-015-15W4/0 | |
Location Alias: 02/08-17-15-15 W4M | |
Location Alias 2: 02/08-17-015-15 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 15 | |
Section: 17 | |
County/Municipality: County of Newell | |
Well Name: TXNE 8C ALDSON 8-17-15-15 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0178906 | |
License Date: 1995-06-28 | |
License Status: Suspension | |
Spud Date: 1995-07-06 | |
Final Drill Date: 1995-07-11 | |
Well Total Depth: 1146.00 m | |
Surface Hole Latitude: 50.259720 | |
Surface Hole Longitude: -112.021942 |
Date | Event |
---|---|
1995-06-28 | Obtained License |
1995-07-07 | Direction Drilling Operation Performed - Deviate |
1995-07-07 | Surface Casing Operation Performed |
1995-07-11 | Finished Drilling |
1995-07-11 | Well Log Performed |
1995-07-11 | Well Mode changed to Drilled and Cased |
1995-07-12 | Well Log Performed |
1995-07-13 | Production Casing Operation Performed |
1995-07-13 | Rig Released |
1995-07-20 | Well Log Performed |
1995-07-22 | Well Log Performed |
1995-07-23 | Perforation Treatment Performed - Jet Perforation |
1995-07-25 | Well Began Production |
1995-07-25 | Well Fluid changed to Crude Oil |
1995-07-25 | Well Mode changed to Pumping |
1995-07-27 | Well Fluid changed to Crude Oil |
1995-07-27 | Well Mode changed to Suspended |
1995-08-18 | Well Log Performed |
1997-10-22 | Well Fluid changed to Crude Oil |
1997-10-22 | Well Mode changed to Pumping |
1997-11-01 | Well Fluid changed to Crude Oil |
1997-11-01 | Well Mode changed to Suspended |
1998-04-23 | Well Fluid changed to Crude Oil |
1998-04-23 | Well Mode changed to Pumping |
1998-06-01 | Well Fluid changed to Crude Oil |
1998-06-01 | Well Mode changed to Suspended |
2008-10-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-10-05 | Plug Back Performed |
2008-10-05 | Well Fluid changed to Crude Oil |
2008-10-05 | Well Log Performed |
2008-10-05 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-07-07 | 215.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-07-23 | Perforation | 1097.00 | 1107.00 | 20 |
2008-10-05 | Packing Device Capped w/Cement | 1081.80 | 1089.80 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 20 | 0.0 | 0.0 | 0.0 |
1997 | 216 | 0.0 | 0.0 | 0.0 |
1998 | 477 | 0.0 | 0.0 | 0.0 |
For data sources see[6]