If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0154150505000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]()  | 
| Location: 00/05-05-015-15W4/0 | |
| Location Alias: 00/05-05-15-15 W4M | |
| Location Alias 2: 00/05-05-015-15 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 015 | |
| Meridian: 4 | |
| Range: 15 | |
| Section: 05 | |
| County/Municipality: County of Newell | |
| Well Name: CVE ALDSON 5-5-15-15 | |
| Operator Name: Cenovus Energy Inc. | |
| License Number: 0096686 | |
| License Date: 1982-07-16 | |
| License Status: RecCertified | |
| Spud Date: 1982-09-18 | |
| Final Drill Date: 1982-09-24 | |
| Well Total Depth: 1028.00 m | |
| Surface Hole Latitude: 50.229250 | |
| Surface Hole Longitude: -112.042966 | 
| Date | Event | 
|---|---|
| 1909-09-09 | Well Log Performed | 
| 1982-07-16 | Obtained License | 
| 1982-09-21 | Kick Occurred | 
| 1982-09-24 | Finished Drilling | 
| 1982-09-26 | Drill Stem Test Performed | 
| 1982-09-28 | Drill Stem Test Performed | 
| 1982-09-29 | Production Casing Operation Performed | 
| 1983-07-30 | Perforation Treatment Performed - Jet Perforation | 
| 1984-09-24 | Well Mode changed to Drilled and Cased | 
| 1993-09-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement | 
| 1993-09-30 | Plug Back Performed | 
| 1993-09-30 | Well Log Performed | 
| 1993-09-30 | Well Mode changed to Abandoned | 
| 1993-10-02 | Perforation Treatment Performed - Jet Perforation | 
| 1993-10-02 | Well Log Performed | 
| 1993-10-03 | Perforation Treatment Performed - Remedial Casing | 
| 1993-10-25 | Perforation Treatment Performed - Acid Squeeze - Press Used | 
| 1993-10-25 | Perforation Treatment Performed - Jet Perforation | 
| 1993-10-26 | Perforation Treatment Performed - Remedial Casing | 
| 1993-12-07 | Well Abandoned | 
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | 
|---|---|---|---|---|
| 1983-07-30 | Perforation | 994.00 | 996.00 | 13 | 
| 1983-07-30 | Perforation | 988.00 | 992.80 | 13 | 
| 1993-09-30 | Packing Device Capped w/Cement | 973.00 | 981.00 | 0 | 
| 1993-10-02 | Perforation | 396.00 | 397.00 | 7 | 
| 1993-10-03 | Remedial Casing Cementing | 396.00 | 397.00 | 0 | 
| 1993-10-25 | Perforation | 260.50 | 261.50 | 7 | 
| 1993-10-25 | Acid Treatment | 260.50 | 261.50 | 0 | 
| 1993-10-26 | Remedial Casing Cementing | 260.50 | 261.50 | 0 | 
For data sources see[4]
 
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) | 
|---|---|---|---|
| 1982-09-21 | Kick | 735.00 | 735.00 | 
For data sources see[5]