X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154143302000

Well Details

Well ID: 0154143302000
Loading map...
Location: 00/02-33-015-14W4/0
Location Alias: 00/02-33-15-14 W4M
Location Alias 2: 00/02-33-015-14 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 14
Section: 33
County/Municipality: County of Newell
Well Name: TXNE 1A-3 HZ ALDSON 2-33-15-14
Operator Name: Torxen Energy Ltd.
License Number: 0496790
License Date: 2019-12-05
License Status: Issued
Spud Date: 2020-01-09
Final Drill Date: 2020-01-15
Well Total Depth: 3641.00 m
Surface Hole Latitude: 50.310626
Surface Hole Longitude: -111.838984

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-09 Savanna Drilling Corp. 410 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-10 760.20 Deviate (5 - 79 degrees)
2020-01-11 1101.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-01-16 Open Hole/Barefoot Completion 1156.00 3641.00 0
2020-02-10 Multi-Stage Fracture 2970.20 2970.30 0
2020-02-10 Multi-Stage Fracture 2828.60 2828.70 0
2020-02-10 Multi-Stage Fracture 2735.10 2735.20 0
2020-02-10 Multi-Stage Fracture 2393.60 2393.70 0
2020-02-10 Multi-Stage Fracture 2317.50 2317.60 0
2020-02-10 Multi-Stage Fracture 2231.60 2231.70 0
2020-02-10 Multi-Stage Fracture 2156.20 2156.30 0
2020-02-10 Multi-Stage Fracture 2070.70 2070.80 0
2020-02-11 Multi-Stage Fracture 1984.90 1985.00 0
2020-02-11 Multi-Stage Fracture 1897.90 1898.00 0
2020-02-10 Multi-Stage Fracture 3614.40 3614.50 0
2020-02-11 Multi-Stage Fracture 1822.30 1822.40 0
2020-02-11 Multi-Stage Fracture 1726.00 1726.10 0
2020-02-11 Multi-Stage Fracture 1632.50 1632.60 0
2020-02-11 Multi-Stage Fracture 1543.00 1543.10 0
2020-02-11 Multi-Stage Fracture 1451.60 1451.70 0
2020-02-11 Multi-Stage Fracture 1373.80 1373.90 0
2020-02-11 Multi-Stage Fracture 1283.60 1283.70 0
2020-02-11 Multi-Stage Fracture 1188.70 1188.80 0
2020-02-10 Multi-Stage Fracture 3537.50 3537.60 0
2020-02-10 Multi-Stage Fracture 3482.10 3482.20 0
2020-02-10 Multi-Stage Fracture 3345.70 3345.80 0
2020-02-10 Multi-Stage Fracture 3256.90 3257.00 0
2020-02-10 Multi-Stage Fracture 3177.60 3177.70 0
2020-02-10 Multi-Stage Fracture 3117.20 3117.30 0
2020-02-10 Multi-Stage Fracture 3050.30 3050.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 634 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-16 No Incident Encountered 0.00 0.00
2020-02-22 No Incident Encountered 0.00 0.00

For data sources see[7]

References