X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154142209000

Well Details

Well ID: 0154142209000
Loading map...
Location: 00/09-22-015-14W4/0
Location Alias: 00/09-22-15-14 W4M
Location Alias 2: 00/09-22-015-14 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 14
Section: 22
County/Municipality: County of Newell
Well Name: TXNE 15C-16 HZ ALDSON 9-22-15-14
Operator Name: Torxen Energy Ltd.
License Number: 0497231
License Date: 2020-01-02
License Status: Issued
Spud Date: 2020-02-04
Final Drill Date: 2020-02-11
Well Total Depth: 3646.00 m
Surface Hole Latitude: 50.265773
Surface Hole Longitude: -111.871033

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-04 Bonanza Drilling Inc. 5 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-05 768.50 Deviate (5 - 79 degrees)
2020-02-06 1126.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-12 Open Hole/Barefoot Completion 1162.00 3646.00 0
2020-03-07 Multi-Stage Fracture 2872.30 2872.40 0
2020-03-07 Multi-Stage Fracture 2806.40 2806.50 0
2020-03-07 Multi-Stage Fracture 2702.00 2702.10 0
2020-03-07 Multi-Stage Fracture 2607.30 2607.40 0
2020-03-07 Multi-Stage Fracture 2551.50 2551.60 0
2020-03-07 Multi-Stage Fracture 2443.60 2443.70 0
2020-03-07 Multi-Stage Fracture 2360.80 2360.90 0
2020-03-07 Multi-Stage Fracture 2250.80 2250.90 0
2020-03-07 Multi-Stage Fracture 2140.60 2140.70 0
2020-03-07 Multi-Stage Fracture 2065.60 2065.70 0
2020-03-07 Multi-Stage Fracture 3612.90 3613.00 0
2020-03-07 Multi-Stage Fracture 2001.00 2001.10 0
2020-03-07 Multi-Stage Fracture 1901.20 1901.30 0
2020-03-07 Multi-Stage Fracture 1849.40 1849.50 0
2020-03-07 Multi-Stage Fracture 1751.30 1751.40 0
2020-03-08 Multi-Stage Fracture 1661.00 1661.10 0
2020-03-08 Multi-Stage Fracture 1571.60 1571.70 0
2020-03-08 Multi-Stage Fracture 1507.40 1507.50 0
2020-03-08 Multi-Stage Fracture 1443.20 1443.30 0
2020-03-08 Multi-Stage Fracture 1352.00 1352.10 0
2020-03-08 Multi-Stage Fracture 1258.60 1258.70 0
2020-03-07 Multi-Stage Fracture 3559.70 3559.80 0
2020-03-08 Multi-Stage Fracture 1190.30 1190.40 0
2020-03-07 Multi-Stage Fracture 3469.40 3469.50 0
2020-03-07 Multi-Stage Fracture 3248.30 3248.40 0
2020-03-07 Multi-Stage Fracture 3183.10 3183.20 0
2020-03-07 Multi-Stage Fracture 3120.80 3120.90 0
2020-03-07 Multi-Stage Fracture 3042.50 3042.60 0
2020-03-07 Multi-Stage Fracture 2977.60 2977.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-12 No Incident Encountered 0.00 0.00
2020-03-17 No Incident Encountered 0.00 0.00

For data sources see[7]

References