If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154141114030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.250649,"lon":-111.861644,"icon":""}]} |
Location: 03/14-11-015-14W4/0 | |
Location Alias: 03/14-11-15-14 W4M | |
Location Alias 2: 03/14-11-015-14 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 14 | |
Section: 11 | |
County/Municipality: County of Newell | |
Well Name: TXNE 16D-9 HZ ALDSON 14-11-15-14 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0489392 | |
License Date: 2018-06-01 | |
License Status: Issued | |
Spud Date: 2018-08-23 | |
Final Drill Date: 2018-08-29 | |
Well Total Depth: 3196.00 m | |
Surface Hole Latitude: 50.250649 | |
Surface Hole Longitude: -111.861644 |
Date | Event |
---|---|
2018-06-01 | Obtained License |
2018-08-24 | Direction Drilling Operation Performed - Deviate |
2018-08-24 | Surface Casing Operation Performed |
2018-08-25 | Direction Drilling Operation Performed - Horizontal |
2018-08-25 | Intermediate Casing Operation Performed |
2018-08-29 | Finished Drilling |
2018-08-29 | Well Log Performed |
2018-08-29 | Well Mode changed to Drilled and Cased |
2018-08-30 | Liner Casing Operation Performed |
2018-08-31 | Perforation Treatment Performed - Open-Hole Completion |
2018-08-31 | Rig Released |
2018-09-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-09-19 | Well Fluid changed to Crude Oil |
2018-09-19 | Well Mode changed to Drilling and Completing |
2018-10-11 | Well Began Production |
2018-10-11 | Well Fluid changed to Crude Oil |
2018-10-11 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-08-23 | Bonanza Drilling Inc. | 6 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-08-24 | 720.00 | Deviate (5 - 79 degrees) |
2018-08-25 | 1156.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-08-31 | Open Hole/Barefoot Completion | 1194.00 | 3196.00 | 0 |
2018-09-17 | Multi-Stage Fracture | 2363.60 | 2363.70 | 0 |
2018-09-17 | Multi-Stage Fracture | 2258.00 | 2258.10 | 0 |
2018-09-17 | Multi-Stage Fracture | 2178.80 | 2178.90 | 0 |
2018-09-17 | Multi-Stage Fracture | 2099.30 | 2099.40 | 0 |
2018-09-17 | Multi-Stage Fracture | 2020.40 | 2020.50 | 0 |
2018-09-17 | Multi-Stage Fracture | 1928.60 | 1928.70 | 0 |
2018-09-17 | Multi-Stage Fracture | 1813.20 | 1813.30 | 0 |
2018-09-17 | Multi-Stage Fracture | 1720.70 | 1720.80 | 0 |
2018-09-17 | Multi-Stage Fracture | 1641.30 | 1641.40 | 0 |
2018-09-17 | Multi-Stage Fracture | 1536.70 | 1536.80 | 0 |
2018-09-17 | Multi-Stage Fracture | 3112.20 | 3112.30 | 0 |
2018-09-17 | Multi-Stage Fracture | 1432.20 | 1432.30 | 0 |
2018-09-17 | Multi-Stage Fracture | 1352.80 | 1352.90 | 0 |
2018-09-17 | Multi-Stage Fracture | 1261.90 | 1262.00 | 0 |
2018-09-17 | Multi-Stage Fracture | 3046.20 | 3046.30 | 0 |
2018-09-17 | Multi-Stage Fracture | 2941.10 | 2941.20 | 0 |
2018-09-17 | Multi-Stage Fracture | 2849.00 | 2849.10 | 0 |
2018-09-17 | Multi-Stage Fracture | 2757.50 | 2757.60 | 0 |
2018-09-17 | Multi-Stage Fracture | 2678.10 | 2678.20 | 0 |
2018-09-17 | Multi-Stage Fracture | 2536.00 | 2536.10 | 0 |
2018-09-17 | Multi-Stage Fracture | 2456.30 | 2456.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-09-17 | 2018-09-17 | 1,008 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water (Including Mix Water Supplied by Client)* | 7732-18-5 | 100 | 78.6082 | N/A | |||
YFFlex120. N002 | Schlumberger | Quartz. Crystalline silica | 14808-60-7 | 100 | 17.7505 | N/A | ||
YFFlex120. N002 | Schlumberger | Energizing Fluid | 1.2.4 Trimethylbenzene (impurity) | 95-63-6 | 100 | 0.0002 | N/A | |
2.2`.2-nitrilotriethanol"" | 102-71-6 | 100 | 0.037 | N/A | ||||
2-hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.1484 | N/A | ||||
2-Propen-1-aminium. N.N-dimethyl-N-2-propen-1-yl-. chloride | 26062-79-3 | 100 | 0.0022 | N/A | ||||
Acetic acid | 64-19-7 | 100 | 0.0012 | N/A | ||||
Acetic acid. potassium salt | 127-08-2 | 100 | 0.0001 | N/A | ||||
Alcohol. C11-14. ethoxylated | 78330-21-9 | 100 | 0.0096 | N/A | ||||
Alcohols. C7-9-iso-. C8-rich. ethoxylated | 78330-19-5 | 100 | 0.0148 | N/A | ||||
Alcohols. C9-11-iso-. C10-rich. ethoxylated | 78330-20-8 | 100 | 0.0138 | N/A | ||||
Amines. dicoco alkylmethyl | 61788-62-3 | 100 | 0 | N/A | ||||
Benzenemethanaminium. N.N-dimethyl-N tetradecyl-. chloride | 139-08-2 | 100 | 0.0011 | N/A | ||||
Benzenemethanaminium. N-hexadecylN.N dimethyl-.chloride | 122-18-9 | 100 | 0.0002 | N/A | ||||
benzododecinium chloride | 139-07-1 | 100 | 0.0033 | N/A | ||||
Dextrin | 9004-53-9 | 100 | 0 | N/A | ||||
Diammonium peroxidisulphate | 7727-54-0 | 100 | 0.0184 | N/A | ||||
Dicoco dimethyl quaternary ammonium chloride | 61789-77-3 | 100 | 0.0004 | N/A | ||||
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin | 30846-35-6 | 100 | 0.016 | N/A | ||||
Glycerol | 56-81-5 | 100 | 0.0226 | N/A | ||||
Guar gum | 9000-30-0 | 100 | 0.2171 | N/A | ||||
Hemicellulase enzyme | 9012-54-8 | 100 | 0 | N/A | ||||
Lactose | 63-42-3 | 100 | 0.0134 | N/A | ||||
Maltodextrin | 9050-36-6 | 100 | 0.0001 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.1267 | N/A | ||||
N-Coco. 1.3-diaminopropane di-acetate | 61791-64-8 | 100 | 0.0028 | N/A | ||||
Naphthalene (Impurity) | 91-20-3 | 100 | 0.0003 | N/A | ||||
Nitrogen. liquid form | 7727-37-9 | 100 | 5.4067 | N/A | ||||
Non-crystalline silica (impurity) | 7631-86-9 | 100 | 0.0005 | N/A | ||||
Oxirane. Methyl-. polymer with Oxirane | 11/6/9003 | 100 | 0.0216 | N/A | ||||
Poly(oxy-1.2-ethanediyl).a-hydro-w-hydroxy- Ethane-1.2-diol. |
25322-68-3 | 100 | 0.0047 | N/A | ||||
Polyethylene glycol monohexyl ether | 31726-34-8 | 100 | 0.0058 | N/A | ||||
Potassium borate | 1332-77-0 | 100 | 0.0693 | N/A | ||||
Potassium hydroxide | 1310-58-3 | 100 | 0.0256 | N/A | ||||
Potassium oleate | 143-18-0 | 100 | 0.0002 | N/A | ||||
Propan-2-ol | 67-63-0 | 100 | 0.001 | N/A | ||||
Solvent naphtha (petroleum). heavy arom. | 64742-94-5 | 100 | 0.0031 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-09-16 | 2018-09-18 | Central Water Distribution Facility | 709 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 1923 | 0.0 | 0.0 | 0.0 |
2019 | 8205 | 0.0 | 0.0 | 0.0 |
2020 | 2038 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-08-31 | No Incident Encountered | 0.00 | 0.00 |
2018-10-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]