If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0154130306020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.229258,"lon":-111.71224,"icon":""}]} |
| Location: 02/06-03-015-13W4/0 | |
| Location Alias: 02/06-03-15-13 W4M | |
| Location Alias 2: 02/06-03-015-13 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 015 | |
| Meridian: 4 | |
| Range: 13 | |
| Section: 03 | |
| County/Municipality: County of Newell | |
| Well Name: TXNE 102 ALDSON 6-3-15-13 | |
| Operator Name: Torxen Energy Ltd. | |
| License Number: 0478785 | |
| License Date: 2016-01-14 | |
| License Status: Suspension | |
| Spud Date: 2016-01-26 | |
| Final Drill Date: 2016-01-27 | |
| Well Total Depth: 1022.00 m | |
| Surface Hole Latitude: 50.229258 | |
| Surface Hole Longitude: -111.712240 |
| Date | Event |
|---|---|
| 2016-01-14 | Obtained License |
| 2016-01-26 | Surface Casing Operation Performed |
| 2016-01-27 | Direction Drilling Operation Performed - Deviate |
| 2016-01-27 | Finished Drilling |
| 2016-01-27 | Well Mode changed to Drilled and Cased |
| 2016-01-28 | Production Casing Operation Performed |
| 2016-01-28 | Well Log Performed |
| 2016-01-29 | Rig Released |
| 2016-07-18 | Perforation Treatment Performed - Jet Perforation |
| 2016-07-18 | Well Log Performed |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2016-01-26 | Precision Drilling Corporation | 255 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2016-01-27 | 241.80 | Deviate (5 - 79 degrees) |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2016-07-18 | Perforation | 977.00 | 979.50 | 20 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-01-29 | No Incident Encountered | 0.00 | 0.00 |
| 2016-08-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]