X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154123507020

Well Details

Well ID: 0154123507020
Loading map...
Location: 02/07-35-015-12W4/0
Location Alias: 02/07-35-15-12 W4M
Location Alias 2: 02/07-35-015-12 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 12
Section: 35
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 7-35-15-12
Operator Name: Cardinal Energy Ltd.
License Number: 0202464
License Date: 1997-06-11
License Status: Suspension
Spud Date: 1997-07-19
Final Drill Date: 1997-07-23
Well Total Depth: 1148.00 m
Surface Hole Latitude: 50.306653
Surface Hole Longitude: -111.548884

For data sources see[1][2]

Well History

Date Event
1997-06-11 Obtained License
1997-07-19 Direction Drilling Operation Performed - Deviate
1997-07-20 Surface Casing Operation Performed
1997-07-23 Finished Drilling
1997-07-23 Well Log Performed
1997-07-23 Well Mode changed to Drilled and Cased
1997-07-24 Production Casing Operation Performed
1997-07-24 Rig Released
1997-07-29 Well Log Performed
1997-08-08 Well Log Performed
1997-08-17 Well Log Performed
1997-08-18 Perforation Treatment Performed - Jet Perforation
1997-09-25 Well Began Production
1997-09-25 Well Fluid changed to Crude Oil
1997-09-25 Well Mode changed to Pumping
2008-08-03 Well Fluid changed to Crude Oil
2008-08-03 Well Mode changed to Suspended
2014-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-30 Plug Back Performed
2014-10-30 Well Fluid changed to Crude Oil
2014-10-30 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-07-19 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-18 Perforation 1108.50 1113.00 20
1997-08-18 Perforation 1113.50 1114.50 20
2014-10-30 Packing Device Capped w/Cement 1094.00 1102.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2276 0.0 0.0 0.0
1998 7383 0.0 0.0 0.0
1999 8658 0.0 0.0 0.0
2000 8125 0.0 0.0 0.0
2001 6441 0.0 0.0 0.0
2002 8702 0.0 0.0 0.0
2003 8488 0.0 0.0 0.0
2004 718 0.0 0.0 0.0
2007 3983 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-30 No Incident Encountered 0.00 0.00

For data sources see[7]

References