X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154121108002

Well Details

Well ID: 0154121108002
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 00/08-11-015-12W4/2
Location Alias: 00/08-11-15-12 W4M
Location Alias 2: 00/08-11-015-12 W4/02
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 12
Section: 11
County/Municipality: County of Newell
Well Name: TXNE ALDSON 8-11-15-12
Operator Name: Torxen Energy Ltd.
License Number: 0266612
License Date: 2002-01-25
License Status: Issued
Spud Date: 2002-01-29
Final Drill Date: 2002-01-31
Well Total Depth: 980.00 m
Surface Hole Latitude: 50.242421
Surface Hole Longitude: -111.544267

For data sources see[1][2]

Well History

Date Event
2002-01-25 Obtained License
2002-01-30 Surface Casing Operation Performed
2002-01-31 Finished Drilling
2002-01-31 Production Casing Operation Performed
2002-01-31 Rig Released
2002-01-31 Well Log Performed
2002-01-31 Well Mode changed to Drilled and Cased
2002-03-05 Perforation Treatment Performed - Jet Perforation
2002-03-05 Well Log Performed
2002-04-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-04-13 Plug Back Performed
2002-04-14 Well Log Performed
2002-10-09 Well Log Performed
2002-10-11 Perforation Treatment Performed - Jet Perforation
2002-10-17 Perforation Treatment Performed - Fractured
2002-10-23 Well Began Production
2002-10-23 Well Fluid changed to Gas
2002-10-23 Well Mode changed to Flowing
2010-09-24 Perforation Treatment Performed - Jet Perforation
2010-11-10 Perforation Treatment Performed - Fractured
2010-12-07 Well Log Performed
2010-12-08 Perforation Treatment Performed - Cement Squeeze
2010-12-08 Plug Back Performed
2010-12-08 Well Fluid changed to Gas
2010-12-08 Well Mode changed to Abandoned Zone
2013-12-15 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-03-05 Perforation 915.00 920.00 17
2010-09-24 Perforation 904.30 906.00 17
2010-09-24 Perforation 908.10 910.00 17
2010-11-10 Fracture 904.30 920.00 0
2010-12-08 Cement Squeeze 589.00 591.00 0
2002-03-05 Perforation 911.00 915.00 17
2002-03-05 Perforation 904.30 906.00 17
2002-03-05 Perforation 908.10 910.00 17
2002-04-13 Packing Device Capped w/Cement 892.00 900.00 0
2002-10-11 Perforation 589.00 591.00 7
2002-10-17 Fracture 589.00 591.00 0
2010-09-24 Perforation 915.00 920.00 17
2010-09-24 Perforation 911.00 915.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 2168 0.0 0.0 0.0
2003 8666 0.0 0.0 0.0
2004 8782 0.0 0.0 0.0
2005 8746 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 6743 0.0 0.0 0.0

For data sources see[5]

References

BESbswy