If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154120804003 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/04-08-015-12W4/3 | |
Location Alias: 00/04-08-15-12 W4M | |
Location Alias 2: 00/04-08-015-12 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 12 | |
Section: 08 | |
County/Municipality: County of Newell | |
Well Name: TXNE ALDSON 4-8-15-12 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0265469 | |
License Date: 2002-01-02 | |
License Status: Issued | |
Spud Date: 2002-01-22 | |
Final Drill Date: 2002-01-24 | |
Well Total Depth: 975.00 m | |
Surface Hole Latitude: 50.239038 | |
Surface Hole Longitude: -111.627987 |
Date | Event |
---|---|
2002-01-02 | Obtained License |
2002-01-23 | Surface Casing Operation Performed |
2002-01-24 | Finished Drilling |
2002-01-24 | Well Log Performed |
2002-01-24 | Well Mode changed to Drilled and Cased |
2002-01-25 | Production Casing Operation Performed |
2002-01-25 | Rig Released |
2002-01-25 | Well Log Performed |
2002-02-22 | Perforation Treatment Performed - Jet Perforation |
2002-02-22 | Well Log Performed |
2002-03-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-03-08 | Perforation Treatment Performed - Jet Perforation |
2002-03-08 | Plug Back Performed |
2002-03-09 | Well Log Performed |
2004-08-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-08-19 | Perforation Treatment Performed - Jet Perforation |
2004-08-19 | Plug Back Performed |
2004-08-19 | Well Log Performed |
2004-09-01 | Well Began Production |
2004-09-01 | Well Fluid changed to Gas |
2004-09-01 | Well Mode changed to Flowing |
2005-10-05 | Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem |
2005-10-05 | Plug Back Performed |
2005-10-05 | Well Fluid changed to Gas |
2005-10-05 | Well Mode changed to Abandoned Zone |
2005-10-08 | Perforation Treatment Performed - Jet Perforation |
2006-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-08-10 | Plug Back Performed |
2006-08-15 | Perforation Treatment Performed - Jet Perforation |
2006-08-15 | Well Log Performed |
2006-08-20 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-02-22 | Perforation | 888.10 | 889.00 | 17 |
2006-08-15 | Perforation | 591.50 | 593.50 | 7 |
2006-08-20 | Fracture | 591.50 | 593.50 | 0 |
2002-02-22 | Perforation | 890.00 | 892.30 | 17 |
2002-03-08 | Packing Device Capped w/Cement | 874.00 | 882.00 | 0 |
2002-03-08 | Perforation | 741.10 | 741.60 | 17 |
2004-08-19 | Packing Device Capped w/Cement | 722.00 | 730.00 | 0 |
2004-08-19 | Perforation | 708.00 | 709.00 | 17 |
2005-10-05 | Packing Dev Cpd w/Res-Gyp Cem | 703.00 | 706.00 | 0 |
2005-10-08 | Perforation | 690.50 | 691.50 | 17 |
2006-08-10 | Packing Device Capped w/Cement | 677.50 | 685.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 898 | 0.0 | 0.0 | 0.0 |
2005 | 1546 | 0.0 | 0.0 | 0.0 |
For data sources see[5]