If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0154120212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.233015,"lon":-111.561759,"icon":""}]} |
| Location: 00/12-02-015-12W4/0 | |
| Location Alias: 00/12-02-15-12 W4M | |
| Location Alias 2: 00/12-02-015-12 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 015 | |
| Meridian: 4 | |
| Range: 12 | |
| Section: 02 | |
| County/Municipality: County of Newell | |
| Well Name: CNRL UNIT ALDERSON 12-2-15-12 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0286596 | |
| License Date: 2003-05-02 | |
| License Status: RecCertified | |
| Spud Date: 2003-08-24 | |
| Final Drill Date: 2003-09-02 | |
| Well Total Depth: 573.00 m | |
| Surface Hole Latitude: 50.233015 | |
| Surface Hole Longitude: -111.561759 |
| Date | Event |
|---|---|
| 2003-05-02 | Obtained License |
| 2003-08-24 | Surface Casing Operation Performed |
| 2003-09-02 | Finished Drilling |
| 2003-09-02 | Production Casing Operation Performed |
| 2003-09-02 | Rig Released |
| 2003-09-02 | Well Mode changed to Drilled and Cased |
| 2003-09-11 | Well Log Performed |
| 2003-10-18 | Perforation Treatment Performed - Jet Perforation |
| 2003-11-03 | Perforation Treatment Performed - Fractured |
| 2003-11-05 | Perforation Treatment Performed - Jet Perforation |
| 2003-11-07 | Perforation Treatment Performed - Fractured |
| 2003-12-08 | Well Began Production |
| 2003-12-08 | Well Fluid changed to Gas |
| 2003-12-08 | Well Mode changed to Flowing |
| 2009-08-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2009-08-13 | Plug Back Performed |
| 2009-08-13 | Well Fluid changed to Gas |
| 2009-08-13 | Well Mode changed to Abandoned Zone |
| 2009-08-30 | Well Abandoned |
| 2009-08-30 | Well Fluid changed to Gas |
| 2009-08-30 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2003-10-18 | Perforation | 385.00 | 386.00 | 7 |
| 2003-10-18 | Perforation | 539.00 | 540.00 | 7 |
| 2003-10-18 | Perforation | 549.00 | 550.00 | 7 |
| 2003-11-03 | Fracture | 385.00 | 550.00 | 0 |
| 2003-11-05 | Perforation | 257.00 | 258.00 | 7 |
| 2003-11-05 | Perforation | 267.00 | 268.00 | 7 |
| 2003-11-05 | Perforation | 276.00 | 277.00 | 7 |
| 2003-11-05 | Perforation | 285.00 | 286.00 | 7 |
| 2003-11-05 | Perforation | 296.00 | 297.00 | 7 |
| 2003-11-05 | Perforation | 307.00 | 308.00 | 7 |
| 2003-11-05 | Perforation | 315.00 | 316.00 | 7 |
| 2003-10-18 | Perforation | 395.00 | 396.00 | 7 |
| 2003-11-05 | Perforation | 326.00 | 327.00 | 7 |
| 2003-11-05 | Perforation | 336.00 | 337.00 | 7 |
| 2003-11-07 | Fracture | 257.00 | 337.00 | 0 |
| 2009-08-13 | Packing Device Capped w/Cement | 371.00 | 379.00 | 0 |
| 2009-08-13 | Packing Device Capped w/Cement | 244.00 | 252.00 | 0 |
| 2003-10-18 | Perforation | 406.00 | 407.00 | 7 |
| 2003-10-18 | Perforation | 417.00 | 418.00 | 7 |
| 2003-10-18 | Perforation | 427.00 | 428.00 | 7 |
| 2003-10-18 | Perforation | 436.00 | 437.00 | 7 |
| 2003-10-18 | Perforation | 469.00 | 470.00 | 7 |
| 2003-10-18 | Perforation | 500.00 | 501.00 | 7 |
| 2003-10-18 | Perforation | 532.00 | 533.00 | 7 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2003 | 744 | 0.0 | 0.0 | 0.0 |
| 2004 | 8779 | 0.0 | 0.0 | 0.0 |
| 2005 | 8758 | 0.0 | 0.0 | 0.0 |
| 2006 | 8759 | 0.0 | 0.0 | 0.0 |
| 2007 | 8741 | 0.0 | 0.0 | 0.0 |
| 2008 | 8777 | 0.0 | 0.0 | 0.0 |
| 2009 | 5076 | 0.0 | 0.0 | 0.0 |
For data sources see[5]