If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0154112902020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]()  | 
| Location: 02/02-29-015-11W4/0 | |
| Location Alias: 02/02-29-15-11 W4M | |
| Location Alias 2: 02/02-29-015-11 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 015 | |
| Meridian: 4 | |
| Range: 11 | |
| Section: 29 | |
| County/Municipality: County of Newell | |
| Well Name: CNRL UNIT 102 ALDERSON 2-29-15-11 | |
| Operator Name: Canadian Natural Resources Limited | |
| License Number: 0252160 | |
| License Date: 2001-02-28 | |
| License Status: Amended | |
| Spud Date: 2001-03-22 | |
| Final Drill Date: 2001-03-22 | |
| Well Total Depth: 500.00 m | |
| Surface Hole Latitude: 50.282222 | |
| Surface Hole Longitude: -111.481790 | 
| Date | Event | 
|---|---|
| 2001-02-28 | Obtained License | 
| 2001-03-17 | Conductor Casing Operation Performed | 
| 2001-03-22 | Finished Drilling | 
| 2001-03-22 | Production Casing Operation Performed | 
| 2001-03-22 | Rig Released | 
| 2001-03-22 | Well Mode changed to Drilled and Cased | 
| 2001-03-26 | Well Log Performed | 
| 2001-04-03 | Perforation Treatment Performed - Jet Perforation | 
| 2001-04-11 | Perforation Treatment Performed - Fractured | 
| 2001-04-13 | Perforation Treatment Performed - Jet Perforation | 
| 2001-04-14 | Perforation Treatment Performed - Fractured | 
| 2001-05-07 | Well Began Production | 
| 2001-05-07 | Well Fluid changed to Gas | 
| 2001-05-07 | Well Mode changed to Flowing | 
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | 
|---|---|---|---|---|
| 2001-04-03 | Perforation | 447.50 | 448.50 | 7 | 
| 2001-04-13 | Perforation | 318.00 | 319.00 | 7 | 
| 2001-04-13 | Perforation | 305.50 | 306.50 | 7 | 
| 2001-04-13 | Perforation | 298.00 | 300.00 | 7 | 
| 2001-04-13 | Perforation | 293.50 | 294.50 | 7 | 
| 2001-04-13 | Perforation | 284.50 | 286.50 | 7 | 
| 2001-04-13 | Perforation | 275.50 | 277.50 | 7 | 
| 2001-04-14 | Fracture | 275.50 | 356.00 | 0 | 
| 2001-04-03 | Perforation | 439.00 | 440.00 | 7 | 
| 2001-04-03 | Perforation | 427.50 | 428.50 | 7 | 
| 2001-04-03 | Perforation | 415.50 | 416.50 | 7 | 
| 2001-04-03 | Perforation | 403.00 | 404.00 | 7 | 
| 2001-04-11 | Fracture | 403.00 | 448.50 | 0 | 
| 2001-04-13 | Perforation | 355.00 | 356.00 | 7 | 
| 2001-04-13 | Perforation | 348.00 | 349.00 | 7 | 
| 2001-04-13 | Perforation | 334.50 | 335.50 | 7 | 
For data sources see[4]
 
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) | 
|---|---|---|---|---|
| 2001 | 5708 | 0.0 | 0.0 | 0.0 | 
| 2002 | 8758 | 0.0 | 0.0 | 0.0 | 
| 2003 | 8757 | 0.0 | 0.0 | 0.0 | 
| 2004 | 8780 | 0.0 | 0.0 | 0.0 | 
| 2005 | 8759 | 0.0 | 0.0 | 0.0 | 
| 2006 | 8759 | 0.0 | 0.0 | 0.0 | 
| 2007 | 8735 | 0.0 | 0.0 | 0.0 | 
| 2008 | 8779 | 0.0 | 0.0 | 0.0 | 
| 2009 | 8686 | 0.0 | 0.0 | 0.0 | 
| 2010 | 8750 | 0.0 | 0.0 | 0.0 | 
| 2011 | 8759 | 0.0 | 0.0 | 0.0 | 
| 2012 | 8783 | 0.0 | 0.0 | 0.0 | 
| 2013 | 8760 | 0.0 | 0.0 | 0.0 | 
| 2014 | 8760 | 0.0 | 0.0 | 0.0 | 
| 2015 | 8652 | 0.0 | 0.0 | 0.0 | 
| 2016 | 8783 | 0.0 | 0.0 | 0.0 | 
| 2017 | 8519 | 0.0 | 0.0 | 0.0 | 
| 2018 | 8594 | 0.0 | 0.0 | 0.0 | 
| 2019 | 8759 | 0.0 | 0.0 | 0.0 | 
| 2020 | 2183 | 0.0 | 0.0 | 0.0 | 
For data sources see[5]