X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154112706000

Well Details

Well ID: 0154112706000
Loading map...
Location: 00/06-27-015-11W4/0
Location Alias: 00/06-27-15-11 W4M
Location Alias 2: 00/06-27-015-11 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 11
Section: 27
County/Municipality: County of Newell
Well Name: CNRL ALDERSON 6-27-15-11
Operator Name: Canadian Natural Resources Limited
License Number: 0042773
License Date: 1972-06-15
License Status: Issued
Spud Date: 1972-06-16
Final Drill Date: 1972-06-18
Well Total Depth: 378.00 m
Surface Hole Latitude: 50.284573
Surface Hole Longitude: -111.442027

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-06-15 Obtained License
1972-06-18 Finished Drilling
1972-06-18 Well Mode changed to Drilled and Cased
1972-06-19 Production Casing Operation Performed
1972-06-26 Perforation Treatment Performed - Jet Perforation
1972-06-30 Perforation Treatment Performed - Fractured
1972-10-14 Well Began Production
1972-10-14 Well Fluid changed to Gas
1972-10-14 Well Mode changed to Flowing
2006-05-14 Well Log Performed
2006-05-15 Perforation Treatment Performed - Jet Perforation
2006-05-15 Well Log Performed
2006-05-25 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-06-26 Perforation 285.30 285.90 3
1972-06-26 Perforation 348.10 348.70 3
1972-06-26 Perforation 351.10 351.70 3
1972-06-30 Fracture 285.30 351.70 0
2006-05-15 Perforation 286.00 287.00 13
2006-05-15 Perforation 301.00 302.00 13
2006-05-25 Fracture 286.00 302.00 0
1972-06-26 Perforation 291.10 291.70 3
1972-06-26 Perforation 295.70 295.70 3
1972-06-26 Perforation 299.90 301.10 3
1972-06-26 Perforation 307.20 307.80 3
1972-06-26 Perforation 331.60 332.20 3
1972-06-26 Perforation 334.70 335.90 3
1972-06-26 Perforation 340.80 341.40 3
1972-06-26 Perforation 345.60 346.30 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 1655 0.0 0.0 0.0
1973 8559 0.0 0.0 0.0
1974 8242 0.0 0.0 0.0
1975 8658 0.0 0.0 0.0
1976 8551 0.0 0.0 0.0
1977 8590 0.0 0.0 0.0
1978 7962 0.0 0.0 0.0
1979 7559 0.0 0.0 0.0
1980 8453 0.0 0.0 0.0
1981 5825 0.0 0.0 0.0
1982 5958 0.0 0.0 0.0
1983 7394 0.0 0.0 0.0
1984 8356 0.0 0.0 0.0
1985 8264 0.0 0.0 0.0
1986 5802 0.0 0.0 0.0
1987 6640 0.0 0.0 0.0
1988 8482 0.0 0.0 0.0
1989 8564 0.0 0.0 0.0
1990 8393 0.0 0.0 0.0
1991 8129 0.0 0.0 0.0
1992 8624 0.0 0.0 0.0
1993 8685 0.0 0.0 0.0
1994 8001 0.0 0.0 0.0
1995 8702 0.0 0.0 0.0
1996 8644 0.0 0.0 0.0
1997 8704 0.0 0.0 0.0
1998 8632 0.0 0.0 0.0
1999 8723 0.0 0.0 0.0
2000 8754 0.0 0.0 0.0
2001 8712 0.0 0.0 0.0
2002 8735 0.0 0.0 0.0
2003 8732 0.0 0.0 0.0
2004 8780 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8709 0.0 0.0 0.0
2008 8779 0.0 0.0 0.0
2009 8686 0.0 0.0 0.0
2010 8750 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8760 0.0 0.0 0.0
2014 8760 0.0 0.0 0.0
2015 8652 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8594 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References