If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154112216040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.265137,"lon":-111.442315,"icon":""}]} |
Location: 04/16-22-015-11W4/0 | |
Location Alias: 04/16-22-15-11 W4M | |
Location Alias 2: 04/16-22-015-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 11 | |
Section: 22 | |
County/Municipality: County of Newell | |
Well Name: CARDINAL 102 MHZ ALDSON 16-22-15-11 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0491961 | |
License Date: 2018-11-13 | |
License Status: Amended | |
Spud Date: 2019-03-05 | |
Final Drill Date: 2019-03-12 | |
Well Total Depth: 2936.00 m | |
Surface Hole Latitude: 50.265137 | |
Surface Hole Longitude: -111.442315 |
Date | Event |
---|---|
2018-11-13 | Obtained License |
2019-03-06 | Lost Circulation Occurred |
2019-03-06 | Surface Casing Operation Performed |
2019-03-07 | Direction Drilling Operation Performed - Deviate |
2019-03-07 | Direction Drilling Operation Performed - Horizontal |
2019-03-08 | Intermediate Casing Operation Performed |
2019-03-12 | Finished Drilling |
2019-03-12 | Well Log Performed |
2019-03-12 | Well Mode changed to Drilled and Cased |
2019-03-24 | Perforation Treatment Performed - Open-Hole Completion |
2019-03-24 | Rig Released |
2019-04-01 | Well Log Performed |
2019-04-08 | Well Fluid changed to Crude Oil |
2019-04-08 | Well Mode changed to Drilling and Completing |
2019-04-17 | Well Began Production |
2019-04-17 | Well Fluid changed to Crude Oil |
2019-04-17 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2019-03-07 | 650.70 | Deviate (5 - 79 degrees) |
2019-03-07 | 1185.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-03-24 | Open Hole/Barefoot Completion | 1287.00 | 2936.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 6375 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-03-06 | Lost Circulation | 251.00 | 251.00 |
For data sources see[7]