If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154111104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.238834,"lon":-111.422259,"icon":""}]} |
Location: 00/04-11-015-11W4/0 | |
Location Alias: 00/04-11-15-11 W4M | |
Location Alias 2: 00/04-11-015-11 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 11 | |
Section: 11 | |
County/Municipality: County of Newell | |
Well Name: TXNE ALDSON 4-11-15-11 | |
Operator Name: Torxen Energy Ltd. | |
License Number: 0023519 | |
License Date: 1962-12-14 | |
License Status: Issued | |
Spud Date: 1962-12-16 | |
Final Drill Date: 1962-12-21 | |
Well Total Depth: 944.30 m | |
Surface Hole Latitude: 50.238834 | |
Surface Hole Longitude: -111.422259 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-12-14 | Obtained License |
1962-12-21 | Finished Drilling |
1962-12-21 | Well Mode changed to Drilled and Cased |
1962-12-22 | Drill Stem Test Performed |
1962-12-23 | Production Casing Operation Performed |
1962-12-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-12-27 | Perforation Treatment Performed - Jet Perforation |
1963-01-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-01-15 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1963-01-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1963-01-15 | Perforation Treatment Performed - Fractured |
1963-02-06 | Well Began Production |
1963-02-06 | Well Fluid changed to Crude Oil |
1963-02-06 | Well Mode changed to Flowing |
1964-10-28 | Well Fluid changed to Crude Oil |
1964-10-28 | Well Mode changed to Pumping |
1966-02-02 | Well Fluid changed to Crude Oil |
1966-02-02 | Well Mode changed to Suspended |
1968-07-22 | Well Log Performed |
1968-08-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1968-08-01 | Well Fluid changed to Crude Oil |
1968-08-01 | Well Mode changed to Abandoned Zone |
1968-08-02 | Perforation Treatment Performed - Jet Perforation |
1968-08-05 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1962-12-27 | Perforation | 927.80 | 929.60 | 13 |
1962-12-27 | Acid Treatment | 927.80 | 929.60 | 0 |
1963-01-10 | Acid Treatment | 927.80 | 929.60 | 0 |
1963-01-15 | Hydra Jet Perforation | 929.00 | 930.20 | 0 |
1963-01-15 | Acid Treatment | 927.80 | 930.20 | 0 |
1963-01-15 | Fracture | 927.80 | 930.20 | 0 |
1968-08-01 | Packing Device Capped w/Cement | 917.40 | 917.40 | 0 |
1968-08-02 | Perforation | 569.70 | 572.40 | 13 |
1968-08-05 | Fracture | 569.70 | 572.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]