X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154110212000

Well Details

Well ID: 0154110212000
Loading map...
Location: 00/12-02-015-11W4/0
Location Alias: 00/12-02-15-11 W4M
Location Alias 2: 00/12-02-015-11 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 11
Section: 02
County/Municipality: County of Newell
Well Name: SLE ALDSON 12-2-15-11
Operator Name: SanLing Energy Ltd.
License Number: 0023827
License Date: 1963-02-15
License Status: Abandoned
Spud Date: 1963-02-15
Final Drill Date: 1963-02-19
Well Total Depth: 936.70 m
Surface Hole Latitude: 50.231561
Surface Hole Longitude: -111.422877

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-02-15 Obtained License
1963-02-19 Finished Drilling
1963-02-19 Well Mode changed to Drilled and Cased
1963-02-20 Drill Stem Test Performed
1963-02-21 Production Casing Operation Performed
1963-02-22 Perforation Treatment Performed - Jet Perforation
1963-03-01 Well Began Production
1963-03-01 Well Fluid changed to Crude Oil
1963-03-01 Well Mode changed to Flowing
1964-10-27 Well Fluid changed to Crude Oil
1964-10-27 Well Mode changed to Pumping
1991-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-09-12 Perforation Treatment Performed - Jet Perforation
1991-09-12 Well Fluid changed to Crude Oil
1991-09-12 Well Log Performed
1991-09-12 Well Mode changed to Pumping
1995-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-12-21 Perforation Treatment Performed - Jet Perforation
1995-12-21 Plug Back Performed
1995-12-21 Well Log Performed
1996-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-16 Plug Back Performed
1996-06-28 Well Abandoned
1996-06-28 Well Fluid changed to Crude Oil
1996-06-28 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-02-22 Perforation 919.90 921.10 13
1991-09-12 Packing Device Capped w/Cement 904.00 912.00 0
1991-09-12 Perforation 892.40 897.30 13
1995-12-21 Packing Device Capped w/Cement 872.00 880.00 0
1995-12-21 Perforation 669.30 671.30 13
1996-06-16 Packing Device Capped w/Cement 643.00 651.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2408 0.0 0.0 0.0
1968 3816 0.0 0.0 0.0
1969 8244 0.0 0.0 0.0
1970 8311 0.0 0.0 0.0
1971 8385 0.0 0.0 0.0
1972 1957 0.0 0.0 0.0
1973 3249 0.0 0.0 0.0
1974 8190 0.0 0.0 0.0
1975 5773 0.0 0.0 0.0
1976 5265 0.0 0.0 0.0
1977 7585 0.0 0.0 0.0
1978 5180 0.0 0.0 0.0
1979 1564 0.0 0.0 0.0
1980 5681 0.0 0.0 0.0
1981 8172 0.0 0.0 0.0
1982 6201 0.0 0.0 0.0
1983 8200 0.0 0.0 0.0
1984 8423 0.0 0.0 0.0
1985 8423 0.0 0.0 0.0
1986 8189 0.0 0.0 0.0
1987 8648 0.0 0.0 0.0
1988 8699 0.0 0.0 0.0
1989 8405 0.0 0.0 0.0
1990 5431 0.0 0.0 0.0

For data sources see[5]

References