X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154040703000

Well Details

Well ID: 0154040703000
Loading map...
Location: 00/03-07-015-04W4/0
Location Alias: 00/03-07-15-04 W4M
Location Alias 2: 00/03-07-015-04 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 04
Section: 07
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 3-7-15-4
Operator Name: Canlin Energy Corporation
License Number: 0188285
License Date: 1996-06-03
License Status: Issued
Spud Date: 1996-06-12
Final Drill Date: 1996-06-13
Well Total Depth: 463.00 m
Surface Hole Latitude: 50.239961
Surface Hole Longitude: -110.548497

For data sources see[1][2]

Well History

Date Event
1996-06-03 Obtained License
1996-06-12 Surface Casing Operation Performed
1996-06-13 Finished Drilling
1996-06-13 Production Casing Operation Performed
1996-06-13 Rig Released
1996-06-13 Well Mode changed to Drilled and Cased
1996-07-06 Well Log Performed
1996-07-09 Perforation Treatment Performed - Fractured
1996-07-09 Perforation Treatment Performed - Jet Perforation
1996-08-16 Well Began Production
1996-08-16 Well Fluid changed to Gas
1996-08-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-07-09 Perforation 287.50 288.00 7
1996-07-09 Perforation 331.00 331.50 7
1996-07-09 Perforation 333.00 333.50 7
1996-07-09 Perforation 335.00 335.50 7
1996-07-09 Perforation 338.00 338.50 7
1996-07-09 Perforation 381.50 383.00 7
1996-07-09 Perforation 385.50 386.50 7
1996-07-09 Perforation 393.50 394.50 7
1996-07-09 Perforation 414.50 416.00 7
1996-07-09 Perforation 417.50 418.50 7
1996-07-09 Fracture 288.00 417.50 0
1996-07-09 Perforation 290.00 290.40 7
1996-07-09 Perforation 293.50 294.00 7
1996-07-09 Perforation 299.00 299.50 7
1996-07-09 Perforation 301.00 301.50 7
1996-07-09 Perforation 305.00 305.50 7
1996-07-09 Perforation 322.00 322.50 7
1996-07-09 Perforation 324.00 324.50 7
1996-07-09 Perforation 326.00 326.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 3272 0.0 0.0 0.0
1997 8671 0.0 0.0 0.0
1998 8733 0.0 0.0 0.0
1999 8757 0.0 0.0 0.0
2000 8781 0.0 0.0 0.0
2001 8711 0.0 0.0 0.0
2002 8584 0.0 0.0 0.0
2003 8447 0.0 0.0 0.0
2004 8663 0.0 0.0 0.0
2005 8370 0.0 0.0 0.0
2006 8726 0.0 0.0 0.0
2007 8684 0.0 0.0 0.0
2008 8745 0.0 0.0 0.0
2009 8715 0.0 0.0 0.0
2010 8582 0.0 0.0 0.0
2011 8588 0.0 0.0 0.0
2012 7988 0.0 0.0 0.0
2013 8747 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8099 0.0 0.0 0.0
2019 8508 0.0 0.0 0.0
2020 2057 0.0 0.0 0.0

For data sources see[5]

References