X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0154031507000

Well Details

Well ID: 0154031507000
Loading map...
Location: 00/07-15-015-03W4/0
Location Alias: 00/07-15-15-03 W4M
Location Alias 2: 00/07-15-015-03 W4/00
Country: Canada
Province: Alberta
Township: 015
Meridian: 4
Range: 03
Section: 15
County/Municipality: Cypress County
Well Name: ESSO MEDICINE HAT 7-15-15-3
Operator Name: TAQA North Ltd.
License Number: 0016985
License Date: 1959-04-30
License Status: Issued
Spud Date: 1959-05-14
Final Drill Date: 1959-05-16
Well Total Depth: 513.30 m
Surface Hole Latitude: 50.257173
Surface Hole Longitude: -110.334074

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-04-30 Obtained License
1959-05-14 Lost Circulation Occurred
1959-05-16 Finished Drilling
1959-05-16 Production Casing Operation Performed
1959-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-05-25 Perforation Treatment Performed - Fractured
1959-05-25 Perforation Treatment Performed - Jet Perforation
1959-07-21 Well Mode changed to Drilled and Cased
1959-08-20 Perforation Treatment Performed - Cement Squeeze
1959-08-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-08-22 Perforation Treatment Performed - Fractured
1959-08-22 Perforation Treatment Performed - Jet Perforation
1959-11-01 Well Began Production
1959-11-01 Well Fluid changed to Gas
1959-11-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-05-25 Perforation 467.60 470.00 13
1959-08-22 Fracture 498.00 503.20 0
1959-05-25 Perforation 470.30 472.70 13
1959-05-25 Acid Treatment 467.60 472.70 0
1959-05-25 Fracture 467.60 472.70 0
1959-08-20 Cement Squeeze 467.60 470.00 0
1959-08-20 Cement Squeeze 470.30 472.70 0
1959-08-22 Perforation 498.00 500.50 13
1959-08-22 Perforation 500.80 503.20 13
1959-08-22 Acid Treatment 498.00 503.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1464 0.0 0.0 0.0
1969 8748 0.0 0.0 0.0
1970 8734 0.0 0.0 0.0
1971 8643 0.0 0.0 0.0
1972 8392 0.0 0.0 0.0
1973 8593 0.0 0.0 0.0
1974 7945 0.0 0.0 0.0
1975 8514 0.0 0.0 0.0
1976 8480 0.0 0.0 0.0
1977 8464 0.0 0.0 0.0
1978 8118 0.0 0.0 0.0
1979 8587 0.0 0.0 0.0
1980 8463 0.0 0.0 0.0
1981 8519 0.0 0.0 0.0
1982 7991 0.0 0.0 0.0
1983 8695 0.0 0.0 0.0
1984 8455 0.0 0.0 0.0
1985 8453 0.0 0.0 0.0
1986 7234 0.0 0.0 0.0
1987 7988 0.0 0.0 0.0
1988 8387 0.0 0.0 0.0
1989 8181 0.0 0.0 0.0
1990 7838 0.0 0.0 0.0
1991 7685 0.0 0.0 0.0
1992 8735 0.0 0.0 0.0
1993 8619 0.0 0.0 0.0
1994 8423 0.0 0.0 0.0
1995 7720 0.0 0.0 0.0
1996 8544 0.0 0.0 0.0
1997 8728 0.0 0.0 0.0
1998 8750 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8570 0.0 0.0 0.0
2006 8538 0.0 0.0 0.0
2007 8596 0.0 0.0 0.0
2008 8586 0.0 0.0 0.0
2009 8700 0.0 0.0 0.0
2010 8725 0.0 0.0 0.0
2011 8641 0.0 0.0 0.0
2012 8712 0.0 0.0 0.0
2013 8662 0.0 0.0 0.0
2014 8610 0.0 0.0 0.0
2015 7966 0.0 0.0 0.0
2016 8685 0.0 0.0 0.0
2017 8673 0.0 0.0 0.0
2018 8627 0.0 0.0 0.0
2019 8495 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1959-05-14 Lost Circulation 103.60 103.60

For data sources see[6]

References