If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0154023305000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.299588,"lon":-110.229242,"icon":""}]} |
Location: 00/05-33-015-02W4/0 | |
Location Alias: 00/05-33-15-02 W4M | |
Location Alias 2: 00/05-33-015-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 015 | |
Meridian: 4 | |
Range: 02 | |
Section: 33 | |
County/Municipality: Cypress County | |
Well Name: Canlin MEDHAT 5-33-15-2 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0314387 | |
License Date: 2004-09-07 | |
License Status: Issued | |
Spud Date: 2004-10-11 | |
Final Drill Date: 2006-01-20 | |
Well Total Depth: 517.00 m | |
Surface Hole Latitude: 50.299588 | |
Surface Hole Longitude: -110.229242 |
Date | Event |
---|---|
2004-09-07 | Obtained License |
2004-10-11 | Conductor Casing Operation Performed |
2004-10-12 | Surface Casing Operation Performed |
2006-01-20 | Finished Drilling |
2006-01-20 | Well Mode changed to Drilled and Cased |
2006-01-21 | Liner Casing Operation Performed |
2006-01-21 | Perforation Treatment Performed - Slotted Liner or Casing |
2006-01-21 | Rig Released |
2006-03-02 | Well Began Production |
2006-03-02 | Well Fluid changed to Gas |
2006-03-02 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-01-21 | Slotted Liner | 392.00 | 514.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 6560 | 0.0 | 0.0 | 0.0 |
2007 | 8139 | 0.0 | 0.0 | 0.0 |
2008 | 4832 | 0.0 | 0.0 | 0.0 |
2009 | 5880 | 0.0 | 0.0 | 0.0 |
2010 | 8253 | 0.0 | 0.0 | 0.0 |
2011 | 8236 | 0.0 | 0.0 | 0.0 |
2012 | 8701 | 0.0 | 0.0 | 0.0 |
2013 | 8723 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8231 | 0.0 | 0.0 | 0.0 |
2018 | 8076 | 0.0 | 0.0 | 0.0 |
2019 | 8047 | 0.0 | 0.0 | 0.0 |
2020 | 1874 | 0.0 | 0.0 | 0.0 |
For data sources see[5]