If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144292606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.198531,"lon":-113.860721,"icon":""}]} |
Location: 00/06-26-014-29W4/0 | |
Location Alias: 00/06-26-14-29 W4M | |
Location Alias 2: 00/06-26-014-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 29 | |
Section: 26 | |
County/Municipality: Municipal District of Willow Creek No. 26 | |
Well Name: CNRL PARKLD 6-26-14-29 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0080473 | |
License Date: 1980-05-12 | |
License Status: Suspension | |
Spud Date: 1980-01-21 | |
Final Drill Date: 1980-05-12 | |
Well Total Depth: 3060.00 m | |
Surface Hole Latitude: 50.198531 | |
Surface Hole Longitude: -113.860721 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-02-29 | Water Flow Occurred |
1980-05-12 | Finished Drilling |
1980-05-12 | Obtained License |
1980-05-13 | Well Log Performed |
1980-05-15 | Production Casing Operation Performed |
1980-06-03 | Perforation Treatment Performed - Jet Perforation |
1980-06-04 | Perforation Treatment Performed - Cement Squeeze |
1980-06-05 | Perforation Treatment Performed - Cement Squeeze |
1980-06-05 | Perforation Treatment Performed - Jet Perforation |
1980-07-08 | Perforation Treatment Performed - Jet Perforation |
1980-07-10 | Perforation Treatment Performed - Fractured |
1980-08-05 | Perforation Treatment Performed - Jet Perforation |
1980-08-17 | Perforation Treatment Performed - Fractured |
1987-04-16 | Well Mode changed to Drilled and Cased |
2013-02-16 | Well Log Performed |
2013-02-23 | Perforation Treatment Performed - Jet Perforation |
2013-02-23 | Well Log Performed |
2013-02-24 | Perforation Treatment Performed - Jet Perforation |
2013-02-24 | Well Log Performed |
2013-02-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2013-02-26 | Well Log Performed |
2013-02-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-02-27 | Perforation Treatment Performed - Cement Squeeze |
2013-02-27 | Perforation Treatment Performed - Jet Perforation |
2013-02-27 | Plug Back Performed |
2013-02-27 | Well Log Performed |
2013-02-27 | Well Mode changed to Abandoned Zone |
2013-02-28 | Well Log Performed |
2013-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-03-01 | Perforation Treatment Performed - Remedial Casing |
2013-03-02 | Perforation Treatment Performed - Jet Perforation |
2013-03-02 | Well Log Performed |
2013-03-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-03-03 | Perforation Treatment Performed - Remedial Casing |
2013-03-05 | Perforation Treatment Performed - Jet Perforation |
2013-03-05 | Well Log Performed |
2013-03-06 | Well Log Performed |
2013-03-08 | Perforation Treatment Performed - Jet Perforation |
2013-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-03-10 | Perforation Treatment Performed - Cement Squeeze |
2013-03-10 | Perforation Treatment Performed - Remedial Casing |
2013-03-10 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-06-03 | Perforation | 2502.00 | 2503.00 | 3 |
2013-02-24 | Perforation | 2939.00 | 2943.00 | 17 |
2013-02-25 | Acid Treatment | 2936.00 | 2945.00 | 0 |
2013-02-27 | Cement Squeeze | 2936.00 | 2945.00 | 0 |
2013-02-27 | Packing Device Capped w/Cement | 2921.00 | 2930.00 | 0 |
2013-02-27 | Perforation | 2686.50 | 2688.50 | 17 |
2013-03-01 | Remedial Casing Cementing | 2686.50 | 2688.50 | 0 |
2013-03-01 | Packing Device Capped w/Cement | 2670.00 | 2680.00 | 0 |
2013-03-02 | Perforation | 2527.00 | 2531.00 | 17 |
2013-03-03 | Remedial Casing Cementing | 2527.00 | 2531.00 | 0 |
2013-03-03 | Packing Device Capped w/Cement | 2512.00 | 2522.00 | 0 |
1980-06-04 | Cement Squeeze | 2502.00 | 2503.00 | 0 |
2013-03-05 | Perforation | 2453.50 | 2456.50 | 17 |
2013-03-08 | Perforation | 2420.00 | 2421.00 | 13 |
2013-03-10 | Cement Squeeze | 2453.50 | 2461.00 | 0 |
2013-03-10 | Remedial Casing Cementing | 2420.00 | 2421.00 | 0 |
2013-03-10 | Packing Device Capped w/Cement | 2366.00 | 2445.00 | 0 |
1980-06-05 | Perforation | 2420.00 | 2421.00 | 3 |
1980-06-05 | Cement Squeeze | 2420.00 | 2421.00 | 0 |
1980-07-08 | Perforation | 2938.00 | 2945.00 | 13 |
1980-07-10 | Fracture | 2938.00 | 2945.00 | 0 |
1980-08-05 | Perforation | 2455.00 | 2461.00 | 13 |
1980-08-17 | Fracture | 2455.00 | 2461.00 | 0 |
2013-02-23 | Perforation | 2936.00 | 2939.00 | 17 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-02-29 | Water Flow | 2456.00 | 0.00 |
2013-03-13 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]