X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144262316F10

Well Details

Well ID: 0144262316F10
Loading map...
Location: F1/16-23-014-26W4/0
Location Alias: F1/16-23-14-26 W4M
Location Alias 2: F1/16-23-014-26 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 26
Section: 23
County/Municipality: Municipal District of Willow Creek No. 26
Well Name: RAMPART 103 PARKLDNE 16-23-14-26
Operator Name: Rampart Oil Inc.
License Number: 0479351
License Date: 2016-04-26
License Status: Issued
Spud Date: 2016-06-03
Final Drill Date: 2016-06-10
Well Total Depth: 2178.00 m
Surface Hole Latitude: 50.191429
Surface Hole Longitude: -113.436635

For data sources see[1][2]

Well History

Date Event
2016-04-26 Obtained License
2016-06-05 Surface Casing Operation Performed
2016-06-09 Direction Drilling Operation Performed - Deviate
2016-06-10 Finished Drilling
2016-06-10 Well Log Performed
2016-06-10 Well Mode changed to Drilled and Cased
2016-06-11 Well Log Performed
2016-06-12 Production Casing Operation Performed
2016-06-12 Rig Released
2016-07-03 Perforation Treatment Performed - Jet Perforation
2016-07-03 Well Log Performed
2016-07-04 Perforation Treatment Performed - Jet Perforation
2016-07-04 Well Log Performed
2016-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2016-12-01 Well Began Production
2016-12-01 Well Fluid changed to Water
2016-12-01 Well Type changed to Source
2018-04-11 Well Log Performed
2018-04-18 Well Log Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-06-03 Precision Drilling Corporation 188 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-06-09 2155.00 Deviate (5 - 79 degrees)

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-07-03 Perforation 2129.00 2145.00 20
2016-07-06 Acid Treatment 2115.00 2123.00 0
2016-07-06 Acid Treatment 2107.00 2110.00 0
2016-07-06 Acid Treatment 2099.00 2103.00 0
2016-07-07 Acid Treatment 2090.00 2096.00 0
2016-07-07 Acid Treatment 2084.00 2087.00 0
2016-07-07 Acid Treatment 2075.00 2080.00 0
2016-07-03 Perforation 2115.00 2123.00 20
2016-07-03 Perforation 2107.00 2110.00 20
2016-07-04 Perforation 2099.00 2103.00 20
2016-07-04 Perforation 2090.00 2096.00 20
2016-07-04 Perforation 2084.00 2087.00 20
2016-07-04 Perforation 2075.00 2080.00 20
2016-07-06 Acid Treatment 2137.00 2145.00 0
2016-07-06 Acid Treatment 2129.00 2137.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 744 0.0 0.0 0.0
2017 8519 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-06-12 No Incident Encountered 0.00 0.00
2016-07-24 No Incident Encountered 0.00 0.00

For data sources see[8]

References