X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144202702002

Well Details

Well ID: 0144202702002
Loading map...
Location: 00/02-27-014-20W4/2
Location Alias: 00/02-27-14-20 W4M
Location Alias 2: 00/02-27-014-20 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 20
Section: 27
County/Municipality: Vulcan County
Well Name: CNRL RETLAW 2-27-14-20
Operator Name: Canadian Natural Resources Limited
License Number: 0024392
License Date: 1963-06-21
License Status: Abandoned
Spud Date: 1963-06-26
Final Drill Date: 1963-07-12
Well Total Depth: 1304.50 m
Surface Hole Latitude: 50.195100
Surface Hole Longitude: -112.651579

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-06-21 Obtained License
1963-07-09 Drill Stem Test Performed
1963-07-10 Drill Stem Test Performed
1963-07-11 Drill Stem Test Performed
1963-07-12 Finished Drilling
1963-07-12 Well Mode changed to Drilled and Cased
1963-07-13 Production Casing Operation Performed
1970-03-09 Perforation Treatment Performed - Jet Perforation
1970-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-08 Perforation Treatment Performed - Jet Perforation
1977-11-02 Well Began Production
1977-11-02 Well Fluid changed to Gas
1977-11-02 Well Mode changed to Flowing
1978-07-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-10-20 Well Fluid changed to Gas
1999-10-20 Well Mode changed to Suspended
2001-10-01 Well Fluid changed to Gas
2001-10-01 Well Mode changed to Flowing
2002-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-25 Plug Back Performed
2002-11-25 Well Fluid changed to Gas
2002-11-25 Well Mode changed to Abandoned Zone
2002-11-26 Perforation Treatment Performed - Jet Perforation
2002-11-26 Well Log Performed
2002-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-11-27 Perforation Treatment Performed - Cement Squeeze
2002-11-27 Plug Back Performed
2002-11-29 Well Abandoned
2002-11-29 Well Fluid changed to Gas
2002-11-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-03-09 Perforation 1222.90 1223.50 13
2002-11-27 Packing Device Capped w/Cement 217.50 236.50 0
1970-03-13 Acid Treatment 1222.90 1223.50 0
1970-03-14 Acid Treatment 1222.90 1223.50 0
1977-03-08 Perforation 1211.30 1214.00 7
1978-07-31 Acid Treatment 1211.30 1214.00 0
2002-11-25 Packing Device Capped w/Cement 1212.70 1220.70 0
2002-11-25 Packing Device Capped w/Cement 1195.00 1203.00 0
2002-11-26 Perforation 241.00 241.50 20
2002-11-27 Cement Squeeze 241.00 241.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 1193 0.0 0.0 0.0
1978 1743 0.0 0.0 0.0
1979 8352 0.0 0.0 0.0
1980 8588 0.0 0.0 0.0
1981 8354 0.0 0.0 0.0
1982 8029 0.0 0.0 0.0
1983 7243 0.0 0.0 0.0
1984 8415 0.0 0.0 0.0
1985 8723 0.0 0.0 0.0
1986 8696 0.0 0.0 0.0
1987 8389 0.0 0.0 0.0
1988 8729 0.0 0.0 0.0
1989 8503 0.0 0.0 0.0
1990 8652 0.0 0.0 0.0
1991 8175 0.0 0.0 0.0
1992 8222 0.0 0.0 0.0
1993 8397 0.0 0.0 0.0
1994 8471 0.0 0.0 0.0
1995 7907 0.0 0.0 0.0
1996 4328 0.0 0.0 0.0
1997 2446 0.0 0.0 0.0
1998 23 0.0 0.0 0.0
2001 2206 0.0 0.0 0.0
2002 1198 0.0 0.0 0.0

For data sources see[5]

References