If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144193016000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.204697,"lon":-112.579174,"icon":""}]} |
Location: 00/16-30-014-19W4/0 | |
Location Alias: 00/16-30-14-19 W4M | |
Location Alias 2: 00/16-30-014-19 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 19 | |
Section: 30 | |
County/Municipality: Vulcan County | |
Well Name: TIBER MRI ET AL L BOW 16-30-14-19 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0074642 | |
License Date: 1979-02-23 | |
License Status: RecCertified | |
Spud Date: 1979-04-30 | |
Final Drill Date: 1979-05-06 | |
Well Total Depth: 1222.00 m | |
Surface Hole Latitude: 50.204697 | |
Surface Hole Longitude: -112.579174 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-02-23 | Obtained License |
1979-05-06 | Finished Drilling |
1979-05-06 | Well Mode changed to Drilled and Cased |
1979-05-08 | Drill Stem Test Performed |
1979-05-09 | Production Casing Operation Performed |
1979-06-28 | Perforation Treatment Performed - Jet Perforation |
1979-07-01 | Well Began Production |
1979-07-01 | Well Fluid changed to Crude Oil |
1979-07-01 | Well Mode changed to Pumping |
1982-11-24 | Perforation Treatment Performed - Jet Perforation |
1983-11-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1983-11-02 | Well Abandoned |
1983-11-02 | Well Fluid changed to Crude Oil |
1983-11-02 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-06-28 | Perforation | 1180.00 | 1181.00 | 7 |
1982-11-24 | Perforation | 1177.00 | 1178.00 | 13 |
1983-11-02 | Packing Device Capped w/Cement | 1158.80 | 1167.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 4096 | 0.0 | 0.0 | 0.0 |
1980 | 7297 | 0.0 | 0.0 | 0.0 |
1981 | 7328 | 0.0 | 0.0 | 0.0 |
1982 | 2862 | 0.0 | 0.0 | 0.0 |
1983 | 2232 | 0.0 | 0.0 | 0.0 |
For data sources see[5]