X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144192301000

Well Details

Well ID: 0144192301000
Loading map...
Location: 00/01-23-014-19W4/0
Location Alias: 00/01-23-14-19 W4M
Location Alias 2: 00/01-23-014-19 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 19
Section: 23
County/Municipality: Municipal District of Taber
Well Name: PIONEER CANADA LITTLE BOW 1-23-14-19
Operator Name: TAQA North Ltd.
License Number: 0105546
License Date: 1984-01-26
License Status: Re-Entered
Spud Date: 1984-01-31
Final Drill Date: 1984-02-07
Well Total Depth: 1184.00 m
Surface Hole Latitude: 50.181064
Surface Hole Longitude: -112.489400

For data sources see[1][2]

Well History

Date Event
1984-01-26 Obtained License
1984-02-07 Finished Drilling
1984-02-07 Well Log Performed
1984-02-07 Well Mode changed to Drilled and Cased
1984-02-08 Drill Stem Test Performed
1984-02-09 Drill Stem Test Performed
1984-02-10 Production Casing Operation Performed
1984-03-06 Perforation Treatment Performed - Jet Perforation
1984-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-09 Perforation Treatment Performed - Fractured
1984-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-20 Well Began Production
1984-03-20 Well Fluid changed to Crude Oil
1984-03-20 Well Mode changed to Pumping
1984-09-01 Well Fluid changed to Crude Oil
1984-09-01 Well Mode changed to Suspended
1985-03-03 Well Log Performed
1985-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-03-04 Plug Back Performed
1985-03-04 Well Abandoned
1985-03-04 Well Fluid changed to Crude Oil
1985-03-04 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-03-06 Perforation 1127.00 1130.00 13
1984-03-06 Perforation 1122.00 1123.00 14
1984-03-07 Acid Treatment 1122.00 1130.00 0
1984-03-08 Acid Treatment 1122.00 1130.00 0
1984-03-09 Fracture 1122.00 1130.00 0
1984-03-16 Acid Treatment 1122.00 1123.00 0
1985-03-04 Packing Device Capped w/Cement 1109.00 1117.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1208 0.0 0.0 0.0

For data sources see[5]

References