X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144183406030

Well Details

Well ID: 0144183406030
Loading map...
Location: 03/06-34-014-18W4/0
Location Alias: 03/06-34-14-18 W4M
Location Alias 2: 03/06-34-014-18 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 18
Section: 34
County/Municipality: Municipal District of Taber
Well Name: CRESCENT POINT LBOW 6-34-14-18
Operator Name: Crescent Point Energy Corp.
License Number: 0130682
License Date: 1987-12-16
License Status: RecCertified
Spud Date: 1987-12-17
Final Drill Date: 1987-12-20
Well Total Depth: 1120.00 m
Surface Hole Latitude: 50.211974
Surface Hole Longitude: -112.382418

For data sources see[1][2]

Well History

Date Event
1987-12-16 Obtained License
1987-12-18 Surface Casing Operation Performed
1987-12-20 Finished Drilling
1987-12-20 Well Mode changed to Drilled and Cased
1987-12-21 Production Casing Operation Performed
1987-12-21 Well Log Performed
1987-12-22 Rig Released
1988-01-09 Well Log Performed
1988-01-11 Perforation Treatment Performed - Jet Perforation
1988-01-23 Well Began Production
1988-01-23 Well Fluid changed to Crude Oil
1988-01-23 Well Mode changed to Pumping
1988-06-08 Well Log Performed
1988-06-09 Well Log Performed
1988-06-10 Perforation Treatment Performed - Jet Perforation
1988-06-14 Perforation Treatment Performed - Remedial Casing
1988-06-24 Perforation Treatment Performed - Jet Perforation
1988-06-24 Perforation Treatment Performed - Remedial Casing
1988-06-24 Well Log Performed
1988-06-25 Perforation Treatment Performed - Jet Perforation
1988-06-25 Perforation Treatment Performed - Remedial Casing
1990-01-12 Perforation Treatment Performed - Jet Perforation
1991-10-24 Well Fluid changed to Crude Oil
1991-10-24 Well Mode changed to Suspended
1995-07-01 Well Fluid changed to Crude Oil
1995-07-01 Well Mode changed to Pumping
1996-08-24 Perforation Treatment Performed - Jet Perforation
1996-08-27 Perforation Treatment Performed - Jet Perforation
1999-10-13 Perforation Treatment Performed - Cement Squeeze
1999-10-17 Perforation Treatment Performed - Jet Perforation
1999-10-17 Well Log Performed
1999-10-18 Perforation Treatment Performed - Fractured
1999-10-19 Well Log Performed
2000-02-15 Well Began Injection
2000-02-15 Well Fluid changed to Water
2000-02-15 Well Type changed to Injection
2003-10-01 Well Fluid changed to Water
2003-10-01 Well Mode changed to Suspended
2003-10-01 Well Type changed to Injection
2008-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-21 Plug Back Performed
2008-02-21 Well Fluid changed to Water
2008-02-21 Well Log Performed
2008-02-21 Well Mode changed to Abandoned Zone
2008-02-21 Well Type changed to Injection
2008-02-28 Perforation Treatment Performed - Jet Perforation
2008-02-28 Well Log Performed
2008-03-04 Perforation Treatment Performed - Remedial Casing
2008-03-05 Perforation Treatment Performed - Cement Plug
2008-03-05 Plug Back Performed
2009-06-15 Well Abandoned
2009-06-15 Well Fluid changed to Water
2009-06-15 Well Mode changed to Abandoned
2009-06-15 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-01-11 Perforation 1074.00 1076.00 13
1996-08-27 Perforation 1077.50 1079.00 13
1999-10-13 Cement Squeeze 1074.00 1079.00 0
1999-10-13 Cement Squeeze 190.00 270.50 0
1999-10-17 Perforation 1083.00 1090.00 13
1999-10-18 Fracture 1083.00 1090.00 0
2008-02-21 Packing Device Capped w/Cement 1062.00 1070.00 0
2008-02-28 Perforation 486.00 487.00 13
2008-03-04 Remedial Casing Cementing 486.00 487.00 0
2008-03-05 Cement Plug 425.90 504.40 0
1988-06-10 Perforation 269.50 270.50 13
1988-06-14 Remedial Casing Cementing 269.50 270.50 0
1988-06-24 Perforation 240.00 241.00 13
1988-06-24 Remedial Casing Cementing 240.00 241.00 0
1988-06-25 Perforation 190.00 191.00 13
1988-06-25 Remedial Casing Cementing 190.00 191.00 0
1990-01-12 Perforation 1075.00 1076.60 13
1996-08-24 Perforation 1075.00 1076.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 4719 0.0 0.0 0.0
1989 1738 0.0 0.0 0.0
1990 965 0.0 0.0 0.0
1991 3366 0.0 0.0 0.0
1995 3042 0.0 0.0 0.0
1996 1029 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0

For data sources see[5]

References