X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144182708003

Well Details

Well ID: 0144182708003
Loading map...
Location: 00/08-27-014-18W4/3
Location Alias: 00/08-27-14-18 W4M
Location Alias 2: 00/08-27-014-18 W4/03
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 18
Section: 27
County/Municipality: Municipal District of Taber
Well Name: CRESCENT POINT LBOW 8-27-14-18
Operator Name: Crescent Point Energy Corp.
License Number: 0075810
License Date: 1979-05-18
License Status: Suspension
Spud Date: 1979-06-08
Final Drill Date: 1979-06-15
Well Total Depth: 1127.00 m
Surface Hole Latitude: 50.200542
Surface Hole Longitude: -112.375487

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-05-18 Obtained License
1979-06-14 Kick Occurred
1979-06-15 Finished Drilling
1979-06-15 Well Mode changed to Drilled and Cased
1979-06-16 Drill Stem Test Performed
1979-06-17 Drill Stem Test Performed
1979-06-18 Drill Stem Test Performed
1979-06-19 Production Casing Operation Performed
1979-07-08 Perforation Treatment Performed - Jet Perforation
1984-12-01 Perforation Treatment Performed - Jet Perforation
1986-02-04 Perforation Treatment Performed - Cement Squeeze
1986-02-07 Perforation Treatment Performed - Jet Perforation
1996-05-10 Perforation Treatment Performed - Jet Perforation
1996-05-10 Well Log Performed
1996-05-11 Perforation Treatment Performed - Fractured
1996-05-13 Perforation Treatment Performed - Cement Squeeze
1996-05-16 Well Log Performed
1996-09-06 Well Began Injection
1996-09-06 Well Fluid changed to Water
1996-09-06 Well Type changed to Injection
1998-09-01 Well Fluid changed to Water
1998-09-01 Well Mode changed to Suspended
1998-09-01 Well Type changed to Injection
1998-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-08 Perforation Treatment Performed - Jet Perforation
1998-10-08 Well Log Performed
2000-02-24 Perforation Treatment Performed - Jet Perforation
2000-02-24 Well Log Performed
2000-02-26 Perforation Treatment Performed - Fractured
2000-05-04 Perforation Treatment Performed - Cement Squeeze
2000-05-04 Plug Back Performed
2013-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-07-04 Plug Back Performed
2013-07-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-07-08 Perforation 1071.50 1074.50 7
1998-10-08 Perforation 810.00 812.00 14
2000-02-24 Perforation 871.50 872.50 20
2000-02-24 Perforation 860.00 861.00 20
2000-02-24 Perforation 835.00 836.00 20
2000-02-24 Perforation 824.00 825.00 20
2000-02-26 Fracture 871.50 872.50 0
2000-02-26 Fracture 860.00 861.00 0
2000-02-26 Fracture 835.00 836.00 0
2000-02-26 Fracture 824.00 825.00 0
2000-02-26 Fracture 810.00 812.00 0
1984-12-01 Perforation 871.50 872.50 13
2000-05-04 Cement Squeeze 810.00 812.00 0
2013-07-04 Packing Device Capped w/Cement 798.00 806.50 0
1986-02-04 Cement Squeeze 871.50 872.50 0
1986-02-07 Perforation 810.00 811.50 13
1986-02-07 Perforation 813.00 814.00 13
1996-05-10 Perforation 1085.00 1087.50 14
1996-05-11 Fracture 1085.00 1087.50 0
1996-05-13 Cement Squeeze 810.00 1074.50 0
1998-10-08 Packing Device Capped w/Cement 1057.00 1065.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-06-14 Kick 995.00 995.00
2013-07-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References