If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0144180806000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.156698,"lon":-112.42804,"icon":""}]} |
Location: 00/06-08-014-18W4/0 | |
Location Alias: 00/06-08-14-18 W4M | |
Location Alias 2: 00/06-08-014-18 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 014 | |
Meridian: 4 | |
Range: 18 | |
Section: 08 | |
County/Municipality: Municipal District of Taber | |
Well Name: SLE RETLAW 6-8-14-18 | |
Operator Name: SanLing Energy Ltd. | |
License Number: 0071889 | |
License Date: 1978-09-12 | |
License Status: Abandoned | |
Spud Date: 1978-09-20 | |
Final Drill Date: 1978-09-24 | |
Well Total Depth: 1163.00 m | |
Surface Hole Latitude: 50.156698 | |
Surface Hole Longitude: -112.428040 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1978-09-12 | Obtained License |
1978-09-24 | Finished Drilling |
1978-09-25 | Drill Stem Test Performed |
1978-09-25 | Kick Occurred |
1978-09-26 | Production Casing Operation Performed |
1978-11-17 | Perforation Treatment Performed - Jet Perforation |
1978-12-18 | Well Mode changed to Drilled and Cased |
1979-08-14 | Well Began Production |
1979-08-14 | Well Fluid changed to Crude Oil |
1979-08-14 | Well Mode changed to Pumping |
1981-07-01 | Well Fluid changed to Crude Oil |
1981-07-01 | Well Mode changed to Suspended |
1989-03-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-03-18 | Well Fluid changed to Crude Oil |
1989-03-18 | Well Log Performed |
1989-03-18 | Well Mode changed to Abandoned Zone |
1989-03-19 | Perforation Treatment Performed - Jet Perforation |
1994-05-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-05-31 | Plug Back Performed |
1994-06-01 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1978-11-17 | Perforation | 1131.00 | 1133.30 | 7 |
1989-03-18 | Packing Device Capped w/Cement | 1129.00 | 1130.00 | 0 |
1989-03-19 | Perforation | 1124.00 | 1126.00 | 13 |
1994-05-31 | Packing Device Capped w/Cement | 1109.00 | 1117.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1979 | 2064 | 0.0 | 0.0 | 0.0 |
1980 | 4582 | 0.0 | 0.0 | 0.0 |
1981 | 1224 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1978-09-25 | Kick | 1163.00 | 1163.00 |
For data sources see[6]