X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144171512003

Well Details

Well ID: 0144171512003
Loading map...
Location: 00/12-15-014-17W4/3
Location Alias: 00/12-15-14-17 W4M
Location Alias 2: 00/12-15-014-17 W4/03
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 17
Section: 15
County/Municipality: Municipal District of Taber
Well Name: LITTLE ROCK ENCHANT 12-15-14-17
Operator Name: Razor Energy Corp.
License Number: 0398194
License Date: 2008-07-03
License Status: Abandoned
Spud Date: 2008-07-14
Final Drill Date: 2008-07-22
Well Total Depth: 1630.00 m
Surface Hole Latitude: 50.171237
Surface Hole Longitude: -112.244453

For data sources see[1][2]

Well History

Date Event
2008-06-09 Well Log Performed
2008-07-03 Obtained License
2008-07-15 Surface Casing Operation Performed
2008-07-16 Direction Drilling Operation Performed - Deviate
2008-07-17 Kick Occurred
2008-07-22 Finished Drilling
2008-07-22 Well Log Performed
2008-07-22 Well Mode changed to Drilled and Cased
2008-07-24 Production Casing Operation Performed
2008-07-25 Rig Released
2008-08-11 Perforation Treatment Performed - Jet Perforation
2008-08-11 Well Log Performed
2008-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-08-13 Plug Back Performed
2008-08-13 Well Log Performed
2008-08-14 Perforation Treatment Performed - Jet Perforation
2008-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-08-17 Perforation Treatment Performed - Bridge Plug No Cement Required
2008-08-18 Perforation Treatment Performed - Jet Perforation
2008-08-18 Well Log Performed
2008-12-09 Well Began Production
2008-12-09 Well Fluid changed to Gas
2008-12-09 Well Mode changed to Flowing
2012-03-01 Well Fluid changed to Gas
2012-03-01 Well Mode changed to Suspended
2013-10-04 Well Fluid changed to Gas
2013-10-04 Well Mode changed to Abandoned Zone
2013-11-04 Perforation Treatment Performed - Cement Plug
2013-11-04 Plug Back Performed
2014-03-15 Perforation Treatment Performed - Jet Perforation
2014-03-17 Perforation Treatment Performed - Cement Plug
2014-03-17 Perforation Treatment Performed - Cement Squeeze
2014-03-17 Perforation Treatment Performed - Chemical Squeeze
2014-03-17 Plug Back Performed
2014-10-04 Well Abandoned
2014-10-04 Well Fluid changed to Gas
2014-10-04 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-07-16 300.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-08-11 Perforation 1573.00 1574.00 20
2014-03-17 Cement Squeeze 301.00 302.00 0
2014-03-17 Cement Plug 296.00 298.00 0
2008-08-13 Packing Device Capped w/Cement 1573.00 1574.00 0
2008-08-14 Perforation 1562.00 1564.00 17
2008-08-16 Acid Treatment 1562.00 1564.00 0
2008-08-17 Bridge Plug, No Cement 1562.00 1564.00 0
2008-08-18 Perforation 1121.00 1124.00 17
2013-11-04 Cement Plug 1107.00 1110.00 0
2014-03-15 Perforation 301.00 302.00 17
2014-03-17 Chemical Squeeze 301.00 302.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 572 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 6054 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-07-17 Kick 1120.00 1120.00
2013-11-04 No Incident Encountered 0.00 0.00
2014-03-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References