X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144160510000

Well Details

Well ID: 0144160510000
Loading map...
Location: 00/10-05-014-16W4/0
Location Alias: 00/10-05-14-16 W4M
Location Alias 2: 00/10-05-014-16 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 16
Section: 05
County/Municipality: Municipal District of Taber
Well Name: LITTLE ROCK ENCHANT 10-5-14-16
Operator Name: Razor Energy Corp.
License Number: 0046505
License Date: 1973-07-11
License Status: Suspension
Spud Date: 1973-07-26
Final Drill Date: 1973-07-29
Well Total Depth: 1058.00 m
Surface Hole Latitude: 50.145638
Surface Hole Longitude: -112.149561

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-07-11 Obtained License
1973-07-29 Finished Drilling
1973-07-30 Drill Stem Test Performed
1973-07-31 Drill Stem Test Performed
1973-08-01 Drill Stem Test Performed
1973-08-02 Production Casing Operation Performed
1973-08-21 Perforation Treatment Performed - Jet Perforation
1973-08-23 Perforation Treatment Performed - Acid Wash - No Pressure
1973-08-30 Well Mode changed to Drilled and Cased
1976-07-08 Perforation Treatment Performed - Fractured
1977-06-01 Well Began Production
1977-06-01 Well Fluid changed to Gas
1977-06-01 Well Mode changed to Flowing
1997-09-01 Well Fluid changed to Gas
1997-09-01 Well Mode changed to Suspended
1999-04-06 Well Fluid changed to Gas
1999-04-06 Well Mode changed to Flowing
2000-02-01 Well Fluid changed to Gas
2000-02-01 Well Mode changed to Suspended
2004-05-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-05-02 Perforation Treatment Performed - Jet Perforation
2004-05-02 Plug Back Performed
2004-05-02 Well Fluid changed to Gas
2004-05-02 Well Log Performed
2004-05-02 Well Mode changed to Abandoned Zone
2004-05-05 Perforation Treatment Performed - Fractured
2015-04-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-04-17 Plug Back Performed
2015-04-17 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-08-21 Perforation 883.30 885.10 3
2015-04-17 Packing Device Capped w/Cement 630.00 640.00 0
1973-08-21 Perforation 885.70 888.20 3
1973-08-23 Acid Wash 883.30 888.20 0
1976-07-08 Fracture 883.30 888.20 0
2004-05-02 Packing Device Capped w/Cement 870.00 880.00 0
2004-05-02 Perforation 660.20 661.40 17
2004-05-02 Perforation 649.20 655.90 17
2004-05-05 Fracture 660.20 661.40 0
2004-05-05 Fracture 649.20 655.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 191 0.0 0.0 0.0
1976 163 0.0 0.0 0.0
1977 3838 0.0 0.0 0.0
1978 6973 0.0 0.0 0.0
1979 6940 0.0 0.0 0.0
1980 7215 0.0 0.0 0.0
1981 7433 0.0 0.0 0.0
1982 5569 0.0 0.0 0.0
1983 2820 0.0 0.0 0.0
1984 5636 0.0 0.0 0.0
1985 5637 0.0 0.0 0.0
1986 5073 0.0 0.0 0.0
1987 4700 0.0 0.0 0.0
1988 6123 0.0 0.0 0.0
1989 7166 0.0 0.0 0.0
1990 8130 0.0 0.0 0.0
1991 7847 0.0 0.0 0.0
1992 7749 0.0 0.0 0.0
1993 8582 0.0 0.0 0.0
1994 3082 0.0 0.0 0.0
1995 5920 0.0 0.0 0.0
1996 4384 0.0 0.0 0.0
1999 324 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-04-17 No Incident Encountered 0.00 0.00

For data sources see[6]

References