X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144152515000

Well Details

Well ID: 0144152515000
Loading map...
Location: 00/15-25-014-15W4/0
Location Alias: 00/15-25-14-15 W4M
Location Alias 2: 00/15-25-014-15 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 15
Section: 25
County/Municipality: County of Newell
Well Name: TXNE ALDSON 15-25-14-15
Operator Name: Torxen Energy Ltd.
License Number: 0043418
License Date: 1972-08-30
License Status: Suspension
Spud Date: 1972-09-06
Final Drill Date: 1972-09-10
Well Total Depth: 1032.40 m
Surface Hole Latitude: 50.205785
Surface Hole Longitude: -111.923203

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-08-30 Obtained License
1972-09-10 Finished Drilling
1972-09-11 Drill Stem Test Performed
1972-09-12 Drill Stem Test Performed
1972-09-12 Production Casing Operation Performed
1972-10-06 Perforation Treatment Performed - Jet Perforation
1972-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-10-12 Perforation Treatment Performed - Cement Squeeze
1972-10-13 Perforation Treatment Performed - Jet Perforation
1972-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-10-13 Well Mode changed to Drilled and Cased
1976-06-02 Perforation Treatment Performed - Cement Squeeze
1976-06-05 Perforation Treatment Performed - Jet Perforation
1977-07-13 Well Began Production
1977-07-13 Well Fluid changed to Gas
1977-07-13 Well Mode changed to Flowing
2015-03-01 Well Fluid changed to Gas
2015-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-10-06 Perforation 1008.90 1009.20 7
1972-10-09 Acid Treatment 1008.90 1009.20 0
1972-10-10 Acid Treatment 1008.90 1009.20 0
1972-10-12 Cement Squeeze 1008.90 1009.20 0
1972-10-13 Perforation 986.00 986.60 7
1972-10-14 Acid Treatment 986.00 986.60 0
1976-06-02 Cement Squeeze 986.00 987.20 0
1976-06-05 Perforation 1004.60 1005.20 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 2585 0.0 0.0 0.0
1978 5320 0.0 0.0 0.0
1979 6014 0.0 0.0 0.0
1980 4954 0.0 0.0 0.0
1981 4928 0.0 0.0 0.0
1982 8308 0.0 0.0 0.0
1983 5465 0.0 0.0 0.0
1984 6962 0.0 0.0 0.0
1985 7852 0.0 0.0 0.0
1986 7868 0.0 0.0 0.0
1987 6431 0.0 0.0 0.0
1988 6885 0.0 0.0 0.0
1989 8410 0.0 0.0 0.0
1990 6486 0.0 0.0 0.0
1991 7925 0.0 0.0 0.0
1992 8468 0.0 0.0 0.0
1993 8155 0.0 0.0 0.0
1994 8496 0.0 0.0 0.0
1995 4865 0.0 0.0 0.0
1996 2400 0.0 0.0 0.0
1997 7008 0.0 0.0 0.0
1998 3442 0.0 0.0 0.0
2000 5956 0.0 0.0 0.0
2001 5401 0.0 0.0 0.0
2002 6872 0.0 0.0 0.0
2003 8518 0.0 0.0 0.0
2004 8694 0.0 0.0 0.0
2005 8597 0.0 0.0 0.0
2006 7933 0.0 0.0 0.0
2007 5887 0.0 0.0 0.0
2008 741 0.0 0.0 0.0
2009 1331 0.0 0.0 0.0
2010 883 0.0 0.0 0.0
2011 3192 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8015 0.0 0.0 0.0
2014 8639 0.0 0.0 0.0
2015 1392 0.0 0.0 0.0

For data sources see[5]

References