X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144150308000

Well Details

Well ID: 0144150308000
Loading map...
Location: 00/08-03-014-15W4/0
Location Alias: 00/08-03-14-15 W4M
Location Alias 2: 00/08-03-014-15 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 15
Section: 03
County/Municipality: Municipal District of Taber
Well Name: PIONEER CANADA HAYS 8-3-14-15
Operator Name: TAQA North Ltd.
License Number: 0130885
License Date: 1987-12-29
License Status: RecCertified
Spud Date: 1988-01-14
Final Drill Date: 1988-01-23
Well Total Depth: 1427.00 m
Surface Hole Latitude: 50.139455
Surface Hole Longitude: -111.961951

For data sources see[1][2]

Well History

Date Event
1987-12-29 Obtained License
1988-01-15 Surface Casing Operation Performed
1988-01-23 Finished Drilling
1988-01-23 Well Log Performed
1988-01-23 Well Mode changed to Drilled and Cased
1988-01-24 Drill Stem Test Performed
1988-01-25 Drill Stem Test Performed
1988-01-26 Drill Stem Test Performed
1988-01-27 Production Casing Operation Performed
1988-01-28 Rig Released
1988-02-05 Well Log Performed
1988-02-07 Perforation Treatment Performed - Jet Perforation
1988-02-07 Well Log Performed
1988-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-03-01 Well Began Production
1988-03-01 Well Fluid changed to Crude Oil
1988-03-01 Well Mode changed to Pumping
1989-09-01 Well Fluid changed to Crude Oil
1989-09-01 Well Mode changed to Suspended
1990-09-16 Well Log Performed
1990-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-17 Plug Back Performed
1990-09-17 Well Abandoned
1990-09-17 Well Fluid changed to Crude Oil
1990-09-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-07 Perforation 1346.00 1350.00 13
1988-02-08 Acid Treatment 1346.00 1350.00 0
1988-02-11 Acid Treatment 1346.00 1350.00 0
1990-09-17 Packing Device Capped w/Cement 1332.00 1340.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1906 0.0 0.0 0.0

For data sources see[5]

References