X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144150206000

Well Details

Well ID: 0144150206000
Loading map...
Location: 00/06-02-014-15W4/0
Location Alias: 00/06-02-14-15 W4M
Location Alias 2: 00/06-02-014-15 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 15
Section: 02
County/Municipality: Municipal District of Taber
Well Name: SLE HAYS 6-2-14-15
Operator Name: SanLing Energy Ltd.
License Number: 0122946
License Date: 1986-03-11
License Status: Amended
Spud Date: 1986-03-18
Final Drill Date: 1986-03-29
Well Total Depth: 1425.00 m
Surface Hole Latitude: 50.139296
Surface Hole Longitude: -111.954482

For data sources see[1][2]

Well History

Date Event
1986-03-11 Obtained License
1986-03-19 Surface Casing Operation Performed
1986-03-29 Finished Drilling
1986-03-29 Well Log Performed
1986-03-29 Well Mode changed to Drilled and Cased
1986-03-30 Well Log Performed
1986-03-31 Production Casing Operation Performed
1986-03-31 Rig Released
1986-04-13 Perforation Treatment Performed - Jet Perforation
1986-04-13 Well Log Performed
1986-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-16 Perforation Treatment Performed - Jet Perforation
1986-04-16 Well Log Performed
1986-04-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-05-24 Perforation Treatment Performed - Fractured
1986-05-27 Perforation Treatment Performed - Jet Perforation
1986-05-28 Perforation Treatment Performed - Fractured
1986-06-04 Well Began Production
1986-06-04 Well Fluid changed to Crude Oil
1986-06-04 Well Mode changed to Pumping
1987-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-28 Perforation Treatment Performed - Jet Perforation
1997-03-29 Perforation Treatment Performed - Fractured
2007-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-14 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-04-13 Perforation 1361.80 1365.50 13
1997-03-28 Perforation 1342.50 1350.00 13
1997-03-28 Perforation 1356.00 1358.00 13
1997-03-28 Perforation 1361.50 1365.50 13
1997-03-29 Fracture 1342.50 1365.50 0
2007-07-13 Acid Treatment 1342.50 1365.50 0
2011-06-14 Chemical Squeeze 1343.50 1365.50 0
1986-04-13 Perforation 1356.00 1358.00 13
1986-04-15 Acid Treatment 1356.00 1365.50 0
1986-04-16 Perforation 1361.70 1365.50 13
1986-04-17 Acid Treatment 1356.00 1365.50 0
1986-05-24 Fracture 1356.00 1365.50 0
1986-05-27 Perforation 1342.50 1346.00 13
1986-05-28 Fracture 1342.50 1346.00 0
1987-09-20 Acid Treatment 1342.50 1346.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 4837 0.0 0.0 0.0
1987 8371 0.0 0.0 0.0
1988 8610 0.0 0.0 0.0
1989 7725 0.0 0.0 0.0
1990 7548 0.0 0.0 0.0
1991 7997 0.0 0.0 0.0
1992 8782 0.0 0.0 0.0
1993 8723 0.0 0.0 0.0
1994 8299 0.0 0.0 0.0
1995 8322 0.0 0.0 0.0
1996 8353 0.0 0.0 0.0
1997 8069 0.0 0.0 0.0
1998 8044 0.0 0.0 0.0
1999 8687 0.0 0.0 0.0
2000 8236 0.0 0.0 0.0
2001 7413 0.0 0.0 0.0
2002 8732 0.0 0.0 0.0
2003 7669 0.0 0.0 0.0
2004 8458 0.0 0.0 0.0
2005 8501 0.0 0.0 0.0
2006 8444 0.0 0.0 0.0
2007 7920 0.0 0.0 0.0
2008 7565 0.0 0.0 0.0
2009 7212 0.0 0.0 0.0
2010 8317 0.0 0.0 0.0
2011 7382 0.0 0.0 0.0
2012 8476 0.0 0.0 0.0
2013 5069 0.0 0.0 0.0
2014 5288 0.0 0.0 0.0
2015 8559 0.0 0.0 0.0
2016 8588 0.0 0.0 0.0
2017 5587 0.0 0.0 0.0
2018 8123 0.0 0.0 0.0
2019 6000 0.0 0.0 0.0
2020 1498 0.0 0.0 0.0

For data sources see[5]

References