X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144142308002

Well Details

Well ID: 0144142308002
Loading map...
Location: 00/08-23-014-14W4/2
Location Alias: 00/08-23-14-14 W4M
Location Alias 2: 00/08-23-014-14 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 14
Section: 23
County/Municipality: County of Newell
Well Name: TXNE 9-23 ALDSON 8-23-14-14
Operator Name: Torxen Energy Ltd.
License Number: 0291219
License Date: 2003-08-12
License Status: Suspension
Spud Date: 2003-08-25
Final Drill Date: 2003-08-28
Well Total Depth: 1146.00 m
Surface Hole Latitude: 50.186726
Surface Hole Longitude: -111.806316

For data sources see[1][2]

Well History

Date Event
2003-08-12 Obtained License
2003-08-26 Direction Drilling Operation Performed - Deviate
2003-08-26 Surface Casing Operation Performed
2003-08-28 Finished Drilling
2003-08-28 Well Log Performed
2003-08-28 Well Mode changed to Drilled and Cased
2003-08-29 Production Casing Operation Performed
2003-08-29 Rig Released
2003-09-29 Perforation Treatment Performed - Jet Perforation
2003-09-29 Well Log Performed
2003-10-01 Perforation Treatment Performed - Bridge Plug No Cement Required
2003-10-01 Perforation Treatment Performed - Jet Perforation
2003-10-01 Well Began Production
2003-10-01 Well Fluid changed to Crude Oil
2003-10-01 Well Log Performed
2003-10-01 Well Mode changed to Flowing
2003-10-02 Well Fluid changed to Crude Oil
2003-10-02 Well Mode changed to Suspended
2003-10-22 Well Fluid changed to Crude Oil
2003-10-22 Well Mode changed to Pumping
2016-03-22 Well Fluid changed to Crude Oil
2016-03-22 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-08-26 262.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-09-29 Perforation 1109.20 1115.00 17
2003-10-01 Bridge Plug, No Cement 1107.90 1108.20 0
2003-10-01 Perforation 1074.00 1077.50 17
2003-10-01 Perforation 1080.00 1083.00 17
2003-10-01 Perforation 1084.00 1085.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1507 0.0 0.0 0.0
2004 8686 0.0 0.0 0.0
2005 8669 0.0 0.0 0.0
2006 8567 0.0 0.0 0.0
2007 8675 0.0 0.0 0.0
2008 7915 0.0 0.0 0.0
2009 8226 0.0 0.0 0.0
2010 8302 0.0 0.0 0.0
2011 5166 0.0 0.0 0.0
2012 6288 0.0 0.0 0.0
2013 8327 0.0 0.0 0.0
2014 8443 0.0 0.0 0.0

For data sources see[6]

References