X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144113601000

Well Details

Well ID: 0144113601000
Loading map...
Location: 00/01-36-014-11W4/0
Location Alias: 00/01-36-14-11 W4M
Location Alias 2: 00/01-36-014-11 W4/00
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 11
Section: 36
County/Municipality: County of Newell
Well Name: CARDINAL ALDSON 1-36-14-11
Operator Name: Cardinal Energy Ltd.
License Number: 0154688
License Date: 1992-11-24
License Status: Suspension
Spud Date: 1993-01-23
Final Drill Date: 1993-01-27
Well Total Depth: 953.00 m
Surface Hole Latitude: 50.209389
Surface Hole Longitude: -111.373465

For data sources see[1][2]

Well History

Date Event
1992-11-24 Obtained License
1993-01-24 Surface Casing Operation Performed
1993-01-27 Finished Drilling
1993-01-27 Well Log Performed
1993-01-27 Well Mode changed to Drilled and Cased
1993-01-28 Production Casing Operation Performed
1993-01-28 Rig Released
1993-01-31 Well Log Performed
1993-02-01 Well Log Performed
1993-02-02 Perforation Treatment Performed - Jet Perforation
1993-02-04 Well Log Performed
1993-02-05 Perforation Treatment Performed - Fractured
1993-03-03 Perforation Treatment Performed - Chemical Squeeze
1994-04-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-19 Plug Back Performed
1994-04-20 Perforation Treatment Performed - Jet Perforation
1994-04-20 Well Log Performed
1994-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-16 Well Began Production
1994-10-16 Well Fluid changed to Water
1994-10-16 Well Type changed to Source
2011-08-11 Well Fluid changed to Water
2011-08-11 Well Mode changed to Suspended
2011-08-11 Well Type changed to Source

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-02-02 Perforation 925.00 927.00 17
1994-04-22 Acid Treatment 665.50 750.50 0
1993-02-05 Fracture 925.00 927.00 0
1993-03-03 Chemical Squeeze 925.00 927.00 0
1994-04-19 Packing Device Capped w/Cement 907.00 915.00 0
1994-04-20 Perforation 665.50 667.00 14
1994-04-20 Perforation 670.00 677.00 14
1994-04-20 Perforation 721.00 726.00 14
1994-04-20 Perforation 736.00 738.00 14
1994-04-20 Perforation 747.50 750.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 2208 0.0 0.0 0.0
2003 3999 0.0 0.0 0.0
2005 5880 0.0 0.0 0.0
2006 8015 0.0 0.0 0.0
2007 8757 0.0 0.0 0.0
2008 1488 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 5087 0.0 0.0 0.0

For data sources see[5]

References