X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144072206002

Well Details

Well ID: 0144072206002
Loading map...
Location: 00/06-22-014-07W4/2
Location Alias: 00/06-22-14-07 W4M
Location Alias 2: 00/06-22-014-07 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 07
Section: 22
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 6-22-14-7
Operator Name: Canlin Energy Corporation
License Number: 0056629
License Date: 1976-01-16
License Status: Issued
Spud Date: 1976-01-19
Final Drill Date: 1976-01-21
Well Total Depth: 606.60 m
Surface Hole Latitude: 50.185792
Surface Hole Longitude: -110.881098

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-01-16 Obtained License
1976-01-21 Finished Drilling
1976-01-21 Production Casing Operation Performed
1976-01-21 Well Mode changed to Drilled and Cased
1976-02-02 Perforation Treatment Performed - Jet Perforation
1976-02-02 Perforation Treatment Performed - Selective Jet Perforations
1976-02-03 Perforation Treatment Performed - Fractured
1976-07-22 Perforation Treatment Performed - Selective Bullet Perforations
1976-08-24 Perforation Treatment Performed - Selective Bullet Perforations
1976-09-01 Well Began Production
1976-09-01 Well Fluid changed to Gas
1976-09-01 Well Mode changed to Flowing
2010-07-01 Well Fluid changed to Gas
2010-07-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-02-02 Selective Jet Perforations 587.70 588.60 0
1976-07-22 Selective Bullet Perforations 348.70 349.30 0
1976-07-22 Selective Bullet Perforations 350.80 355.10 0
1976-07-22 Selective Bullet Perforations 359.40 359.40 0
1976-08-24 Selective Bullet Perforations 440.10 440.70 0
1976-08-24 Selective Bullet Perforations 444.70 445.00 0
1976-02-02 Perforation 590.70 592.50 7
1976-02-02 Selective Jet Perforations 598.60 598.60 0
1976-02-03 Fracture 587.70 598.60 0
1976-07-22 Selective Bullet Perforations 290.20 305.40 0
1976-07-22 Selective Bullet Perforations 309.40 310.30 0
1976-07-22 Selective Bullet Perforations 311.20 313.30 0
1976-07-22 Selective Bullet Perforations 318.50 322.20 0
1976-07-22 Selective Bullet Perforations 326.40 331.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2852 0.0 0.0 0.0
1977 8613 0.0 0.0 0.0
1978 7880 0.0 0.0 0.0
1979 8754 0.0 0.0 0.0
1980 5918 0.0 0.0 0.0
1981 8726 0.0 0.0 0.0
1982 4556 0.0 0.0 0.0
1983 6298 0.0 0.0 0.0
1984 8077 0.0 0.0 0.0
1985 8307 0.0 0.0 0.0
1986 5855 0.0 0.0 0.0
1987 8278 0.0 0.0 0.0
1988 8758 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8721 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8741 0.0 0.0 0.0
1998 8740 0.0 0.0 0.0
1999 8755 0.0 0.0 0.0
2000 8776 0.0 0.0 0.0
2001 8691 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8451 0.0 0.0 0.0
2004 7631 0.0 0.0 0.0
2005 7380 0.0 0.0 0.0
2006 8007 0.0 0.0 0.0
2007 7992 0.0 0.0 0.0
2008 8737 0.0 0.0 0.0
2009 8429 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8735 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[5]

References