X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144062410002

Well Details

Well ID: 0144062410002
Loading map...
Location: 00/10-24-014-06W4/2
Location Alias: 00/10-24-14-06 W4M
Location Alias 2: 00/10-24-014-06 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 06
Section: 24
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 10-24-14-6
Operator Name: Canlin Energy Corporation
License Number: 0049471
License Date: 1974-03-26
License Status: Issued
Spud Date: 1974-03-29
Final Drill Date: 1974-03-31
Well Total Depth: 423.70 m
Surface Hole Latitude: 50.189657
Surface Hole Longitude: -110.693135

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-03-26 Obtained License
1974-03-30 Lost Circulation Occurred
1974-03-31 Finished Drilling
1974-03-31 Well Mode changed to Drilled and Cased
1974-04-01 Production Casing Operation Performed
1974-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-05-22 Perforation Treatment Performed - Jet Perforation
1974-05-23 Perforation Treatment Performed - Jet Perforation
1974-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-05-24 Perforation Treatment Performed - Fractured
1975-02-27 Perforation Treatment Performed - Selective Jet Perforations
1975-02-28 Perforation Treatment Performed - Fractured
1975-03-07 Well Began Production
1975-03-07 Well Fluid changed to Gas
1975-03-07 Well Mode changed to Flowing
2009-10-01 Well Fluid changed to Gas
2009-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-05-22 Perforation 396.50 399.60 7
1975-02-27 Selective Jet Perforations 304.80 306.00 0
1975-02-27 Selective Jet Perforations 309.70 312.10 0
1975-02-27 Selective Jet Perforations 313.00 315.50 0
1975-02-27 Selective Jet Perforations 318.50 322.80 0
1975-02-27 Selective Jet Perforations 327.40 328.30 0
1975-02-27 Selective Jet Perforations 329.20 329.20 0
1975-02-28 Fracture 268.80 329.20 0
1974-05-22 Acid Treatment 396.50 399.60 0
1974-05-23 Perforation 396.50 399.60 7
1974-05-24 Acid Treatment 396.50 399.60 0
1974-05-24 Fracture 396.50 399.60 0
1975-02-27 Selective Jet Perforations 268.80 276.10 0
1975-02-27 Selective Jet Perforations 277.40 280.40 0
1975-02-27 Selective Jet Perforations 283.20 289.30 0
1975-02-27 Selective Jet Perforations 290.20 299.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 6981 0.0 0.0 0.0
1976 7704 0.0 0.0 0.0
1977 8408 0.0 0.0 0.0
1978 7857 0.0 0.0 0.0
1979 7963 0.0 0.0 0.0
1980 6897 0.0 0.0 0.0
1981 3841 0.0 0.0 0.0
1982 7248 0.0 0.0 0.0
1983 5965 0.0 0.0 0.0
1984 7749 0.0 0.0 0.0
1985 8673 0.0 0.0 0.0
1986 7443 0.0 0.0 0.0
1987 7283 0.0 0.0 0.0
1988 8763 0.0 0.0 0.0
1989 8393 0.0 0.0 0.0
1990 8723 0.0 0.0 0.0
1991 8385 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8742 0.0 0.0 0.0
1998 8730 0.0 0.0 0.0
1999 8756 0.0 0.0 0.0
2000 8777 0.0 0.0 0.0
2001 7983 0.0 0.0 0.0
2002 6599 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1974-03-30 Lost Circulation 83.80 83.80

For data sources see[6]

References