X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0144061906002

Well Details

Well ID: 0144061906002
Loading map...
Location: 00/06-19-014-06W4/2
Location Alias: 00/06-19-14-06 W4M
Location Alias 2: 00/06-19-014-06 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 06
Section: 19
County/Municipality: Cypress County
Well Name: Canlin MEDHAT 6-19-14-6
Operator Name: Canlin Energy Corporation
License Number: 0057307
License Date: 1976-02-27
License Status: Issued
Spud Date: 1976-06-14
Final Drill Date: 1976-06-15
Well Total Depth: 463.00 m
Surface Hole Latitude: 50.185659
Surface Hole Longitude: -110.815877

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-27 Obtained License
1976-06-15 Finished Drilling
1976-06-15 Production Casing Operation Performed
1976-06-15 Well Mode changed to Drilled and Cased
1976-08-24 Perforation Treatment Performed - Bullet Perforation
1976-08-24 Perforation Treatment Performed - Fractured
1976-08-30 Perforation Treatment Performed - Fractured
1976-08-30 Perforation Treatment Performed - Selective Bullet Perforations
1976-09-01 Well Began Production
1976-09-01 Well Fluid changed to Gas
1976-09-01 Well Mode changed to Flowing
2009-10-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-24 Bullet Perforation 405.40 406.60 3
1976-08-30 Selective Bullet Perforations 339.90 340.80 0
1976-08-30 Selective Bullet Perforations 342.00 345.30 0
1976-08-30 Selective Bullet Perforations 349.00 359.70 0
1976-08-30 Fracture 299.30 359.70 0
1976-08-24 Bullet Perforation 407.80 409.00 3
1976-08-24 Bullet Perforation 429.50 431.00 3
1976-08-24 Bullet Perforation 434.30 435.30 3
1976-08-24 Fracture 405.40 435.30 0
1976-08-30 Selective Bullet Perforations 299.30 301.10 0
1976-08-30 Selective Bullet Perforations 308.80 311.80 0
1976-08-30 Selective Bullet Perforations 313.90 321.30 0
1976-08-30 Selective Bullet Perforations 331.90 338.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2852 0.0 0.0 0.0
1977 8597 0.0 0.0 0.0
1978 7857 0.0 0.0 0.0
1979 7744 0.0 0.0 0.0
1980 5914 0.0 0.0 0.0
1981 8514 0.0 0.0 0.0
1982 4386 0.0 0.0 0.0
1983 6297 0.0 0.0 0.0
1984 8008 0.0 0.0 0.0
1985 8304 0.0 0.0 0.0
1986 5855 0.0 0.0 0.0
1987 8278 0.0 0.0 0.0
1988 8758 0.0 0.0 0.0
1989 8747 0.0 0.0 0.0
1990 8725 0.0 0.0 0.0
1991 8758 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8759 0.0 0.0 0.0
1994 8754 0.0 0.0 0.0
1995 8744 0.0 0.0 0.0
1996 8783 0.0 0.0 0.0
1997 8741 0.0 0.0 0.0
1998 8738 0.0 0.0 0.0
1999 8757 0.0 0.0 0.0
2000 8778 0.0 0.0 0.0
2001 8691 0.0 0.0 0.0
2002 6551 0.0 0.0 0.0

For data sources see[5]

References